1.1 This Code may be called the "Chhattisgarh State Electricity Supply Code, 2005" 1.2 This shall come into force from the date of its publication in the Chhattisgarh Rajpatra. 1.3 It shall extend to the whole of the State of Chhattisgarh. 1.4 It shall apply to all persons engaged in the business of distribution of electricity as distribution licensees including the Chhattisgarh State Electricity Board and its agents under the Electricity Act, 2003 and to the consumers of electricity. It shall also apply to all persons exempted from distribution licence under sec. 13 of the Act. 1.5 Copies of this Code [***] as duly amended from time to time, shall be kept in the registered offices, regional offices, circle offices, division offices, centres of the licensees and such other offices as may be specified by the licensees or by the Commission. Mechanism for review of Electricity Supply Code 1.6 The Commission shall constitute an Electricity Supply Code Review Panel (Review Panel) to review this Code [***] on regular basis. The Review Panel shall consist of such number of persons, as the Commission may consider necessary and adequate, to be appointed by the Commission, including persons representing the following :(a) Each Distribution Licensee of the State;
(b) State Transmission Utility (STU) or Transmission licensees;
(c) LT consumers, HT consumers, EHT consumers, their associations and any consumer groups; and
(d) Any other interest group including, NGO as the Commission may think fit.
[1.7 The commission shall appoint the Chairman from among the representatives of the licensees and an officer of the Commission as Member Secretary of the Committee. The licensee whose representative is appointed Chairman of the Committee, shall provide all the required support, administrative and otherwise, to the panel as may be required for the discharge of its functions. All members of the review panel shall be appointed for period of two years.] 1.8 The Review Panel shall meet at least once every six (6) months. 1.9 The Member Secretary of the Review Panel shall send the proceedings of the meetings of the Panel to the Commission within 15 days of the meetings. 1.10 The Commission may amend the Electricity Supply Code suo motu or on the recommendations of the said panel. However, before any amendment is made in the Code, comments on the proposed changes shall be obtained from all the Distribution licensees, STU, Transmission licensees and the public. 1.11 A notice of the gist of amendment made in the Electricity Supply Code shall be published by the licensee in at least two newspapers having wide circulation in the area of supply stating that copies of the amended Electricity Supply Code are available for purchase in the offices mentioned in clause 1.5.Chapter 2
Definition
2.1 In this Code, unless it is repugnant to the context(a) 'Act' means the Electricity Act, 2003 (No. 36 of 2003) as amended from time to time;
(b) 'Agreement' with its grammatical variations and cognate expressions means an agreement entered into between the licensee and the consumer under this Code;
(c) 'Apparatus' means electrical apparatus and includes all machines, fittings, accessories and appliances in which conductors are used;
(d) 'Area of supply' means the geographic area within which a licensee is authorized by his license to supply electricity;
(e) 'Average Power Factor' means the monthly power factor and shall be the ratio expressed as a percentage of the total kilowatt hours to the total kilovolt ampere hours supplied during the month; the ratio being rounded off to two decimal figures, 5 or above in the third place of decimal being rounded off to the next higher place in the second. In case KWh or KVAh reading is not available, then power factor shall be calculated on the basis of KVARh reading, if the meter has KVARh recording feature.
(f) 'Billing Month' means a period of about 30 days or between the two consecutive meter readings for the purpose of billing;
(g) 'Breakdown' means an occurrence relating to the equipment of the electric energy supply system including electrical line that prevents its normal functioning;
(h) 'Code' means the Chhattisgarh State Electricity Supply Code, as in force from time to time;
(i) 'Commission' means the Chhattisgarh State Electricity Regulatory Commission;
(j) 'Conductor' means any wire, cable, bar, tube, rail or plate used for conducting electrical energy and so arranged as to be electrically connected to a system;
(k) 'Connected load' means aggregate of the manufacturer's rating of all energy consuming devices, in the consumer's premises, which can be simultaneously used. This shall be expressed in KW, KVA or HP units and shall be determined as per the procedure laid down in clauses 6.37 to 6.42 on 'Rating of Installations' in this Code;
(l) 'Consumer' means any person who is supplied electricity by a licensee and includes any person whose premises are for the time being connected for the purpose of receiving electricity from the licensee, persons who have applied for an electricity connection, persons whose supply is not yet connected even after due notice to avail connection or whose electricity supply has been disconnected. A consumer is -
(i) 'Low Tension Consumer (LT Consumer)' if he obtains supply from the licensee at low or medium voltage;
(ii) 'High Tension Consumer (HT Consumer)' if he obtains supply from the licensee at high voltage; and
(iii) 'Extra High Tension Consumer (EHT Consumer)' if he obtains supply from the licensee at extra high voltage;
(m) 'Consumer's installation' means any composite electrical unit including electric wires, fittings, motors and apparatus, portable and stationary, erected and wired by or on behalf of the consumer at the consumer's premises;
(n) 'Contract demand' means the maximum load in KW, KVA or HP, as the case may be, agreed to be supplied by the licensee and contracted by the consumer and mentioned in the agreement;
(o) 'Cut-out' means any appliance for automatically interrupting the transmission of energy through any conductor when the current rises above a predetermined quantum, and shall also include fusible cut-out;
(p) 'Date of commencement of supply' means the day immediately following the date of expiry of a period of one month for in case of LT connections and three months in case of HT and EHT connections from the date of intimation to an intending consumer of the availability of power or the date of actual availing of supply by such consumer, whichever is earlier;
(q) 'Demand charge' for a billing period means a charge levied on the consumer based on the contract demand or maximum demand and shall be calculated as per the procedure provided in the tariff order, passed by the Commission, under part VII of the Act;
(s) 'Earthed' or 'connected with earth' means connected with the general mass of earth in such manner as to ensure at all times an immediate discharge of energy without danger;
(t) 'Energy' means electrical energy;
(i) generated, transmitted or supplied, for any purpose, or
(ii) used for any purpose except the transmission of a message;
(u) 'Energy charge' refers to a charge levied on the consumer based on the quantity of electricity (units in KWh or KVAh as per tariff) supplied;
(v) 'Extra High Voltage' means the voltage, which exceeds 33,000 volts subject, however, to the percentage variation allowed under the Indian Electricity Rules, 1956;
(w) 'Harmonics' means a component of a periodic wave having frequency that is an integral multiple of the fundamental power line frequency of 50 Hz causing distortion to pure sinusoidal waveform of voltage or current, and as governed by IEEE STD 519-1992, namely "IEEE Recommended Practices and Requirements for Harmonic Control in Electrical Power Systems" and corresponding standard as may be specified in accordance with clause (c) of sub-section (2) of Section 185 of the Act;
(x) 'High Voltage (HV)' means the voltage higher than 650 volts but which does not exceed 33,000 volts under normal conditions subject to the percentage variation allowed under the Indian Electricity Rules, 1956;
(y) 'Initial period of agreement' means the period of two years starting from the date of commencement of supply or expiry of notice to avail supply. The initial period of agreement shall continue till the end of the month, on which the end date of the two year period expires;
(z) 'Installation' means any composite electrical unit used for the purpose of generating, transforming, transmitting, converting, distributing or utilizing energy;
(aa) 'Licensed Electrical Contractor' means a contractor licensed under rule 45 of the Indian Electricity Rules, 1956;
(bb) 'Licensee' means a distribution licensee, unless the context otherwise requires.
(cc) 'Load Factor' means the ratio of the total number of units consumed during a given period to the total number of units which may have been consumed had the contract demand/sanctioned load been maintained throughout the same period, and shall usually be expressed as a percentage; (dd) 'Low Voltage (LV)' means the voltage, which does not exceed 250 volts under normal conditions subject, however to the percentage variation allowed under the Indian Electricity Rules, 1956;
(ee) 'Maximum demand' for a category of consumer shall be calculated as per the procedure provided in the tariff order passed by the Commission;
(ff) 'Medium voltage' means the voltage higher than 250 volts but which does not exceed 650 volts under normal; conditions subject, however, to the percentage variation allowed under the Indian Electricity Rules, 1956;
(gg) 'Meter' means a set of integrating instruments and equipments used to measure and/or record and/or store the electrical quantities like energy in KWh or KVAh, maximum demand in KW or KVA, reactive energy in KVARh etc. in a given time, which include whole current meter and metering equipment such as Current Transformers (CT), Capacitor Voltage Transformer (CVT), Potential Transformers (PT) with cable, wiring, where used in conjunction with such meter or its accessories and any devices like switches or MCB/load limiter or fuses used for protection and testing purposes and any enclosure used for housing or fixing such meter or its accessories; and
(hh) 'Month' means a calendar month.
2.2 All other expressions used herein but not specifically defined, but defined in the Act, shall have the meaning assigned them in the Act. The other expressions used herein but not specifically defined in this Code or in the Act but defined under any law passed by the Parliament applicable to electricity industry in the state or stated in the tariff order passed by the Commission, under section 62 of the Act shall have the meaning assigned to them in such law. Subject to the above, the expressions used herein but not specifically defined in this Code or in the Act or any law passed by the Parliament shall have the meaning as is generally assigned to them in the electricity supply industry.Chapter 3
System of Supply and Classification of Consumers
3.1 System of Supply. - The declared frequency of the alternating current (AC) shall be 50 cycles per second. 3.2 The declared voltage of the AC supply is as follows :(a) Low Tension
(i) Single Phase : 230 volts between phase and neutral;
(ii) Three Phase : 400 volts between phases;
(b) High Tension (HT) - Three Phase : 11 KV or 33 KV between phases; and
(c) Extra High Tension (EHT) - Three Phase : 132 KV or 200 KV between phases. For Railway traction two-phase supply may be given.
3.3 The licensee shall design and operate a distribution system in conjunction with the transmission systems. The licensee shall not permit the voltage at the point of supply to the consumer to vary from the declared voltage which is :(a) In the case of low or medium voltage, by more than 6%; or
(b) In the case of high voltage, by more than 6% on the higher side or by more than 9% on the lower side; or
(c) In the case of extra high voltage, by more than 10% on the higher side or by more than 12.5% on the lower side.
Any exception to the above will only be allowed with the written consent of the consumer or with prior approval of the Commission. 3.4 Voltage of Supply to Consumers The supply voltage for different contract demands shall normally be as follows :
Supply Voltage |
Minimum Contract Demand |
Maximum Contract Demand |
230 volts |
|
2 KW |
400 volts |
Above 2 KW |
100 HP or 75 KW |
11 KV |
60 KVA |
300 KVA |
33 KV |
60 KVA |
10000 KVA |
132 KV |
4000 KVA |
40000 KVA |
220 KV |
15000 KVA |
150000 KVA |
Chapter 4
New Power Supply
4.1 Licensee's Obligation to Supply. - The licensee shall, on an application by the owner or occupier of any premises located in his area of supply, give supply of electricity to such premises within the time specified in this Code (refer clause 4.77), provided(a) the supply of power is technically feasible,
(b) the consumer has observed the procedure specified in this Code, and
(c) the consumer agrees to bear the cost of supply and services as specified.
Licensee's obligation to extend the distribution system and consumer's share in the cost 4.2 The licensee shall meet the cost for strengthening/upgradation of the system to meet the demand of the existing consumers though its annual revenues or funds arranged by the licensee and this cost shall be recovered from the consumers through tariff. A part of such expenses shall be met by [supply arranging charges] as prescribed by the Commission from time to time. 4.3 The cost of extension of distribution mains and extension/upgradation of the system upto the point of supply for meeting demand of new consumers shall be payable by the consumer, or any collective body of consumers or otherwise as may be directed by the Commission keeping in view the provisions of section 46 of the Act. 4.4 In all cases of new connections the consumer shall bear the actual cost of extension and service connection charges. 4.5 The service connection charges shall be as approved by the Commission from time to time. In cases where the charges are not approved, the consumer shall bear the actual cost of extension of the service connection 4.6 Apart from the charges as payable under clause 4.4, the supply affording charges, as approved by the Commission, will be payable by all the three phase consumers except agriculture consumers and flour mills in rural area. 4.7 In case the connected/contracted load of any new connection is projected to be 50 KW or more, a separate transformer of adequate capacity shall be installed at consumer's cost. The land/room with easy access required for housing the transformer sub-station, switch gears, meters and panels shall be provided by the consumer, free of cost, for which rent or premium shall not be payable by the licensee. 4.8 The service connection/extension of distribution mains, notwithstanding that it has been paid for by the consumer, shall be the property of the licensee. The licensee shall maintain it at his cost and shall also have the right to use the same service connection/extension for supply of energy to any other person, but such extension or service connection should not adversely affect supply to the consumer who has paid for the extension of the distribution supply network. 4.9 When the licensee is ready to give supply, he shall serve a notice on the consumer to take power supply within one month in case of LT consumers and three months in case of HT or EHT consumers. If the consumer fails to avail supply within the notice period, he shall be liable to pay any charges due thereon as per the provisions of the supply agreement from me day following the end of the notice period. 4.10 Service connection/extension work got done by consumers The consumer can get the work of drawing of service line from the licensee's distribution mains up to his premises as per the estimates and layout approved by the licensee through a 'C' or higher-class licensed electrical contractor, and the work of extension of EHT and HT line, distribution or HT sub-station and LT line through an 'A' class contractor as per the estimates and layout approved by the licensee. In such case the consumer himself shall procure the materials. The material should, conform to relevant BIS specification or its equivalent and should bear ISI mark wherever applicable. The licensee may ask for documentary evidence to verify the quality of materials used. The consumer shall be required to pay the supervision charges as approved by the Commission in the Schedule of Miscellaneous Charges on the cost of works as per the estimates approved by the licensee. The rates of the materials shall be available in the ready reckoner. 4.11 The consumer shall get the work done within the time frame as provided in clause 4.77, failing which the licensee may, on giving fifteen days notice treat the requisition for supply as cancelled. [4.12 Application for Supply Application for new supply and subsequent additional supply of electrical energy shall be made in duplicate in the appropriate prescribed form, copies of which shall be available at a nominal cost at the local office of the licensee. The format of the application forms is provided in Annexure 1 and Annexure 2. Acknowledgement for the application shall be issued forthwith on presentation of the application. Photocopies of blank forms or form downloaded from the website of the licensee may also be used by the consumer and shall be accepted by the licensee.] 4.13 The occupier of the premises, for which supply is required, shall make the application and shall indicate his full name and address with telephone number (if available) where the supply is required and also the name and address of the licensed electrical contractor through whom the wiring will be carried out; but it would not be necessary to make the requisition through the licensed electrical contractor. Any assistance or information required in filling up the form should be given to the consumer at the local office of the licensee. 4.14 The consumer shall furnish, along with the application form, copies of the following documents. The licensee may ask for the original documents, from the consumer, for verification.(a) Proof of legal ownership of the premises in the form of registered sale deed or partition deed or succession or heirship certificate or deed of last will, or
Proof of occupancy such as valid power of attorney or latest rent receipt or valid lease deed or rent agreement or copy of allotment order issued by the owner of the property, or In case of supply for agriculture/irrigation pump set, the copy of the current Khasra giving the 'khasra' number of the field within which the supply is required and water availability certificate from competent government authority.(b) Approval/permission of the local/statutory authority, if required under any law/statute. This shall be required for the industrial and large non-domestic connections.
(c) In case of a partnership firm, partnership deed, authorization in the name of the applicant for signing the application form and agreement.
(d) In case of a Public or Private Limited Company, the Memorandum and Articles of Association and Certificate of incorporation together with an authorization in the name of the applicant for signing the application form and agreement.
(e) Permission from Environment Conservation Department in case of industry falls under the purview of environmental clearance.
(f) SSI registration in case of small and medium industries.
(g) In case of applications for power supply to stone crushers, stone polishing and hot-mix plants, the following additional information shall also be furnished.:
(i) Documentary evidence from the department concerned to show that he will be able to take requisitioned quantum of power supply for at least two years; and
(ii) His permanent address.
(h) The consumer shall also intimate whether the service line and extensions, if any, shall be laid by the consumer or the licensee.
(i) Processing fee, as fixed by the Commission, shall also be payable at the time of submission of application.
4.15 In case of a new connection for domestic or single-phase non-domestic category, the applicant is unable to provide the proof of legal occupation of the premises, the officer in charge of the concerned distribution circle may wave such requirement and record, in writing, the reasons thereof. But in such cases, the applicant shall execute an indemnity bond, indemnifying the licensee against any damages payable on account of any dispute arising out of supply of power to the premises. However, in such cases, the security deposit to be paid by the consumers shall be equal to the cost of ninety day's of average consumption to be determined by the licensee's local office. The serving of connection to such premises shall not be used as a proof of legal rights on the premises or for any other legal use. 4.16 If the consumer, in respect of an earlier agreement executed in his name or in the name of a firm or company with which he was associated either as a partner, director or managing director, has any arrears of electricity dues or other dues on the premises for which the new connection is applied and such dues are payable to the licensee, the requisition for supply may not be entertained by the licensee until the dues are paid in full. In case of a person occupying a new property, it will be the obligation of that person to check the bills for the previous months or, in case of disconnected supply the amount due as per the licensee's records immediately before his occupation and ensure that all outstanding electricity dues as specified in the bills are duly paid up and discharged. The licensee shall be obliged to issue a certificate of the amount outstanding from the connection that was installed or is installed in such premises on request made by such person. The licensee may refuse to supply electricity to the premises through the already existing connection or refuse to give a new connection to the premises till such outstanding dues are cleared. [4.17 (i) Electricity will be supplied to a consumer at a single point for the entire premises. For the purpose of these terms and conditions of supply, premises shall be deemed to be separate.(a) it owned by different persons or taken on lease by different persons, the terms of lease being valid for a period of at least two years at the time of connection;
(b) for the domestic category, households having relevant document from local authorities, identifying the premises as separate;
(c) for domestic premises part of which is used for non-domestic purposes; and
(d) industrial establishments manufacturing different products, not as part of single manufacturing process, their physical location being different and distinct.
(ii) Each separate premises will be given separate point of supply.]
Supply to different categories of consumers (A) Supply at LT 4.18 The licensee shall verify the application and the enclosed documents at the time of receipt of application. A written acknowledgment Shall be issued on the spot if the application is complete. If the application is incomplete, or otherwise the entries are defective, the shortcomings shall be intimated to the applicant in writing within 5 working days. After the complete application is received from the consumers, the licensee shall issue a written acknowledgement to the consumer immediately. Within 3 working days of receipt of the completed application form, the licensee shall intimate the consumer the proposed date of inspection which should be within the next 2 working days in urban areas and 5 working days in rural areas. 4.19 The applicant along with the licensed contractor or his representative shall be present during the inspection. During the inspection, the licensee shall:(a) Fix the point of supply at a mutually agreed place where meter and cut-out/MCB shall be fixed.
(b) Fix the layout of the proposed lines and sub-station and estimate the distance between the point of supply and the nearest distribution mains from where supply could be given.
(c) Determine if the supply line is to go over any property belonging to a third party.
(d) Verify other particulars mentioned in the application form, as required.
4.20 When the consumer's premises has no frontage on a street and the service line from the licensee's mains has to go upon, over or under the adjoining premises of any other person (whether or not the adjoining premises be owned jointly by the consumer and such other person), or in any other case, the consumer shall bring at his own expenses any necessary way-leave, license or sanction for extension of distribution mains and service line and furnish to the licensee. The licensee shall not arrange supply of power until the way-leave, license or sanction is received. Any extra expense incurred in placing the supply line in accordance with the terms of the way-leave, license or sanction shall be born by the consumer. In the event of the way-leave, license or sanction being cancelled or withdrawn, the consumer shall, at his own cost arrange for, or in case the work is carried out by the licensee at the consumer's request, pay full cost of, any diversion of the service line or the provision of any new service line thus rendered necessary. 4.21 It shall not be incumbent on the licensee to ascertain the validity or adequacy of way-leave, license or sanction obtained by the consumer. 4.22 In case it is possible to extend supply from the existing mains, the licensee will forward to the consumer, within 10 working day in urban areas and 15 working days in rural areas, an advice for the charges for laying the service line, the amount of security deposit and any other charges as applicable. The amount shall be payable in full within 15 working days, after which only any work for laying the service line will be taken up. The licensee will also intimate to the consumer to execute the agreement. 4.23 In case it is necessary to extend distribution mains for giving supply to the consumer, the licensee will forward to the consumer, within 10 days in urban areas and within 15 days in rural areas, an advice containing the charges for extension of the distribution main, laying the service line, the amount of security deposit, any other charges as applicable and will also intimate additional formalities required, if any, to be carried out by the consumer. In cases where the consumer has to lay the service line and extension of mains, the consumer shall pay the supervision charges on cost of extension of the distribution mains and laying the service line in addition to payment of other charges as may be applicable. The amount shall be payable in full within 15 working days along with completion of other formalities, after which only the work for laying the distribution mains and service line can be taken up. The licensee will also intimate the consumer to furnish test report in the prescribed form. 4.24 In case the consumer fails to complete the formalities within 15 days, the licensee shall give him notice to complete the formalities within the next 15 days failing which, his application for supply shall be cancelled. Thereafter the consumer shall have to apply afresh for supply or additional supply as the case may be. 4.25 On deposit of charges as indicated above by the consumer, execution of the agreement and receipt of test report and intimation that the service line and extension work have been completed, the licensee shall intimate the consumer, within 3 days, the date of testing of the consumer's installation. The consumer shall ensure that the licensed electrical contractor, who has carried out the wiring, should remain present during the testing. 4.26 On testing the consumer's installation, if the licensee is satisfied with the test results, the licensee shall arrange to install the meter with the cut-out or MCB, seal the meter in presence of the consumer and provide supply within the stipulated time specified in this Code. If the licensee is not satisfied, he shall intimate the consumer the shortcomings in the wiring, in writing. The applicant shall be required to get the defects rectified. On payment of the prescribed fee, testing shall again be conducted. 4.27 All works shall be completed within the time frame specified in clause 4.77. [4.27A If any developer/builder/housing society/group of consumers wants to lay HT/LT line through underground cable, he shall be allowed to do so subject to the condition that the relevant Indian Standards are followed and the followed and the laying of cable is through trench only, This is applicable to multi-consumer complexes and housing colonies. 4.27B If any developer/builder/housing society/group of consumers wishes to provide transformer of rating more than 315 KVA at 11/04 KV voltage with special type of equipment (with ISI mark), such consumer shall have to install an extra unit as standby : This will be applicable to multi-consumer complexes and housing colonies.] (B) LT Supply to Multi-Consumer Complex [***] : 4.28 For the purpose of providing new power supply to a building or a group of buildings requiring more than one connection and a total load of 50 KW or more, the building shall be considered as a multi-consumer complex. [Multi-consumer complex shall include both residential, non-residential complexes, such as commercial complexes, office complexes and educational institutions. Educational institutions shall be provided a single connection.] 4.29 The supply to a multi-consumer complex shall be arranged through a separate distribution transformer of adequate capacity but not less than 100 KVA. The cost of extension including H.T. line, distribution transformer and LT. lines/cables shall be borne by the developer/builder/society/consumer. 4.30 The developer/builder/society/consumer shall also pay [supply arranging charges]. The system strengthening charge is the charge recoverable from consumers for strengthening the licensees network. The developer/builder/society/consumer may be any agency of the State Government, a local body or a private person who constructs the multi-consumer complex. 4.31 In case it is not possible to give supply to the multi-consumer complex by augmentation of the capacity of existing 33/11 KV sub-station or the load of the housing colony exceeds 2150 KW, the developer/builder/society/consumer shall bear the cost of the 33 KV line and 33/11 KV sub-station of required capacity. In such cases [supply arranging charges], if any, shall not be payable as per the Schedule of Miscellaneous Charges approved by the Commission. 4.32 In case the total load of the multi consumer complex including all phases exceeds 1000 KW, the developer/builder/society/consumers shall provide necessary land measuring not less than 40x30 meters at a token premium of Re. 1, for construction of 33/11 KV sub-station by the licensee. The location of the same shall be selected by the Executive Engineer in-charge of the area according to the load centre. [4.33 Meters shall be provided at one place normally in the pillar box as may be decided by the licensee in accordance with the procedure laid down in chapter 8 on meters.] 4.34 The land/room required for housing the transformer sub-station and meters shall be provided by the developer/builder/society/consumer free of cost for which rent or premium shall not be paid by the licensee. Transformers should preferably be placed in open areas. In case installation of transformer in a room or closed area is unavoidable, all safety measures as per prevailing rules and regulations should be taken. 4.35 Connections for common facilities like lift, water pumps etc. shall be given in the name of the builder/developer/society. If requisitions for supply to individual flats are not received from the flat owners, connections may be given in the name of the builder/developer/society. Such connections may subsequently be transferred to the individual owner/occupier of the flat after completing the necessary formalities prescribed in this regard. The agreement for such individual connection shall be executed accordingly. 4.36 In case the original approved plan is for a multi-consumer complex, but the builder/developer/society/consumer desires to avail connection for a portion of it, the connections shall be provided treating it as multi-consumer complex. 4.37 Due to additional construction or additional requirement of load, if a building comes under the category of multi-consumer complex and if a separate distribution transformer of sufficient capacity, for giving supply to such building was not provided earlier, it will be provided at the cost of the builder/developer/society/ consumer. Alternatively, the builder/developer/society/consumer shall arrange to suitably augment the capacity of the existing sub-station, if found feasible by the licensee. However, the [supply arranging charges], if any, shall be payable for the new connections or additional load only. 4.38 For the purpose of considering the criteria of a multi-consumer complex, for development of infrastructure for extension of distribution mains and for calculating the [supply arranging charges], the load of the multi-complex shall be calculated on the following basis (area represents built-up area of individual unit):
|
Load |
|
(i) |
For residential complexes |
|
(a) |
Upto 400 sq. ft. |
1.5 KW |
(b) |
Above 400 sq. ft. & upto 700 sq. ft. |
2.0 KW |
(c) |
Above 700 sq. ft. & upto 1000 sq. ft. |
3.0 KW |
(d) |
Above 1000 sq. ft. & upto 1300 sq. ft. |
4.0 KW |
(e) |
Above 1300 sq. ft. & upto 1600 sq. ft. |
5.0 KW |
(f) |
Above 1600 sq. ft. & upto 2000 sq. ft. |
7.0 KW |
(g) |
Above 2000 sq. ft. & upto 2500 sq. ft. |
10 KW |
(h) |
For every additional 500 sq. ft. or part thereof over 2500 sq. ft. of built up area, 1 KW of load should be added to 10 KW. |
|
(ii) |
For non-residential complexes |
|
|
For each 100 sq. ft. built up area |
1 KW] |
Note. - |
The load of the common facilities like lift, water pump, parking lights etc. shall be taken as declared by the developer/builder/society/consumer. The aforesaid procedure for estimation of load is for the purpose of bringing about uniformity in the assessment of the load of multi-consumer complexes. However, Security deposit etc. shall be worked out on the basis of the load as declared by the consumer and supported by the test report at the time of providing connection to individual consumers. For the Purpose of computation of load, the built up area of individual consumers shall be taken in the case of residential multi-consumer complexes, where as in the case of educational institutions and non-residential multi-consumer complexes the entire built up area of the complex shall be taken.] |
|
Area |
Load |
(a) |
Upto 500 sq. ft. |
1.0 KW |
(b) |
Above 500 sq. ft. & upto 1000 sq. ft. |
2.0 KW |
(c) |
Above 1000 sq. ft. & upto 1500 sq. ft. |
3.0 KW |
(d) |
Above 1500 sq. ft. & upto 2000 sq. ft. |
4.0 KW |
(e) |
Above 2000 sq. ft. & upto 2400 sq. ft. |
5.0 KW |
(f) |
Above 2400 sq. ft. & upto 3000 sq. ft. |
7.0 KW |
(g) |
Above 3000 sq. ft. & upto 3500 sq. ft. |
10.0 KW |
(h) |
Plot or house for EWS |
1.0 KW |
for every additional area of 500 sq.ft. or part thereof over and above 3500 sq.ft of plot area, 1KW of load should be added to 10 KW.] |
|
S.No. |
Type of Service |
Time Limit for Rendering the Service |
1 |
LT connection |
|
(a) |
Notice of inspection on receipt of complete application |
3 working days |
(b) |
Inspection after sending notice |
|
|
(a) Urban areas |
2 working days |
|
(b) Rural areas |
5 working days |
(c) i. |
Issue of demand note to the applicant for payment of estimated charges (if extension work is not required and the connection is to be given from the existing network) |
|
|
(a) Urban areas |
5 working days |
|
(b) Rural areas |
7 working days |
ii. |
Issue of demand note to the applicant for payment of estimated charges (if the extension work or enhancement of transformer capacity is required) |
|
|
(a) Urban areas |
10 working days |
|
(b) Rural areas |
22 days |
(d) |
Serving of power availability notice for commencement of supply/Commencement of supply in area where licensee's distribution system exists |
|
i. |
After payment of necessary charges (if the connection is required to be given from existing network) |
|
|
(a) Urban areas |
15 working days |
|
(b) Rural areas |
15 working days |
ii. |
After payment of necessary charges (if extension work or enhancement in transformer capacity is required) |
|
|
(a) All connections excluding agriculture |
60 days |
|
(b) Agricultural connection during season when clear access to fields is available |
90 days |
|
(c) Agricultural connection during season when no clear access is available |
180 days from the date access is made available |
2. |
High Tension Connection |
|
|
(a) Informing feasibility after receipt of the application |
15 working days |
|
(b) Issue of demand note of estimated charges (after issue of notice of feasibility) |
30 days |
|
(c) Serving of power availability notice for commencement of supply/release of connection after receipt of estimated charges subject to receipt of clearance from Electrical Inspector |
|
|
i. If no extension work is involved |
30 days |
|
ii. If extension work is involved |
90 days |
3. |
Extra High Tension Connection |
|
|
(a) Informing feasibility after receipt of the application |
30 working days |
|
(b) Issue of demand note of estimated charges after issue of notice of feasibility |
60 days |
|
(c) Serving of power availability notice for commencement of supply/release of connection after receipt of estimated charges |
180 days (Since it will involve extension of line) (subject to receipt of clearance from Electrical Inspector) |
(a) Where no extension of distribution mains is required
(b) Where extension of distribution mains upto two poles is required
(c) Where extension of distribution mains of more than two poles is required
4.79 The Commission may for reasons to be recorded, direct deviations from the above clause 4.1 to 4.78 if in the opinion of the Commission the circumstances warrant such deviation. The Commission may issue such direction by an order to the licensee.Chapter 5
Point of Supply and Licensee's Equipment in Premises
5.1 Point of Supply. - Unless otherwise agreed to, the point of supply shall be at the out-going terminals of the licensee's :(a) cut-outs in the case of LT consumers; and
(b) control switchgear that may be installed in the licensee's or consumer's premises as agreed to mutually in the case of HT or EHT consumers.
5.2 Supply shall be given at a single point in the premises [***] at the incoming terminals of the licensee's cut-outs/MCB/control switchgear. However in case of coal mines the licensee may provide supply at more than one point in the installation of the consumer having regard to the physical layout of the installation and the requirements of the consumer. [One of the connections of an existing consumer who has two different connections for supply in his premises, shall be discontinued on expiry of their present agreement.] 5.3 Dedicated Feeder Consumers desirous of getting power supply from dedicated feeders may request for such facility to the licensee. The dedicated feeder may be extended from the power sub-station to the consumer's point of supply. In such cases the consumers shall be liable to pay the cost of bay and all protection switchgears and its accessories provided at the power sub-station for this feeder in addition to the cost of the feeder. On receipt of such request, the licensee will check the feasibility based on merit of providing a dedicated feeder to the consumer's premises. Such dedicated feeder shall be the property of the licensee and shall be maintained by the licensee. Such feeder shall not be used to extend supply to any other consumer within the initial period of two years from the date of commissioning. 5.4 Licensee's Equipment on Consumer's Premises The consumer shall provide free of cost to the licensee necessary land belonging to the consumer and afford all reasonable facilities for bringing in not only the direct cables or overhead lines from the licensee's system for servicing the consumer, but also cables or overhead lines connecting licensee's other consumers and shall permit the licensee to install all requisite switchgears and connections thereto on the above premises and to extend supply to such other consumers through the cables and terminals situated on the consumer's premises, provided supply to the consumer in the opinion of the licensee is not thereby unduly affected. 5.5 The meter, cut-out/MCB, service mains and other equipment belonging to the licensee/provided by the consumer must on no account be handled or removed by any one who is not an authorized employee/representative of the licensee. The seals, which are fixed on the meters/metering equipments, load limiters and the licensee's apparatus, must on no account be tampered, damaged and broken. The responsibility for the safe custody of licensee's equipments and seals on the meters/metering equipments within the consumer's premises shall be on the consumer. 5.6 In the event of any damage caused to the licensee's equipments in the consumer's premises by reason of any act, neglect or default of the consumer or his employees/representatives, the cost thereof as claimed by the licensee shall be payable by the consumer. If the consumer fails to do so on demand, it shall be treated as a contravention of the terms and conditions of supply agreement and the supply shall be liable to be disconnected after due notice. The consumer shall however be liable to pay the charges as per the provisions in clause 7.20 of this Code. 5.7 The licensee is responsible for maintaining the meters and equipments, installed at consumer's premises from where electricity is supplied to the consumer. 5.8 Failure of fuse/supply : The licensee's service fuse or fuses fail at any time, complaint thereof should be sent to the licensee's local office as specified in the "Internal Grievance Redressal Mechanism" approved by the Commission. Only authorized employees possessing the photo-identity card of the licensee are permitted to replace these fuses in the licensee's cut-outs. Consumers are not allowed to replace these fuses. The licensee should not allow its employees to carry out any repairs in the consumer's installations. 5.9 The licensee shall take all reasonable precautions to ensure continuity of supply of electrical energy to the consumer but shall not be responsible for or liable to the consumer for any loss to him or damage to his plant and equipment due to interruptions in supply of electrical energy due to force majeure conditions provided in clause 12.1 5.10 The licensee shall always be entitled for the purpose connected with the working of its supply system to temporarily discontinue the supply for such period as may be necessary, subject to reasonable advance notice being given in this behalf, with the object of causing minimum inconvenience to the consumer.Chapter 6
Wiring and Apparatus in Consumer Premises
6.1 Wiring and installation of equipments and apparatus in consumer's premises. - For the protection of the consumer and the public in general, it is necessary that the wiring on the consumer's premises should conform to the Indian Electricity Rules, 1956, and the rules of the Fire Insurance Company in terms of which the building is insured and be carried out by a licensed electrical contractor. The materials used for wiring shall conform to the relevant specifications of the Bureau of Indian Standards or its equivalent. Wherever applicable the materials used shall bear ISI mark. As soon as the consumer's installation is completed in all respects and tested by the consumer's contractor, the consumer should submit to the licensee, the contractor's test report. The test report form (Annexure-4) for this purpose shall be submitted to the local office of the licensee. It is important that the conditions stated therein are fully complied with, as otherwise there may be a delay in obtaining the supply. 6.2 As required by rule 45 of the Indian Electricity Rules, 1956, no electrical installation work, including addition, alteration, repair and adjustment to existing installation except the replacement of lamps, fans, fuses, switches and other component parts of the installations - which in no way alter the capacity or character of the installation, shall be carried out in the premises on behalf of any consumer or owner for the purpose of supply of energy to such consumer or owner, except by an electrical contractor licensed by the State Government in this behalf and under the direct supervision of a person holding a certificate of competency or by a person holding a permit issued or recognized by the State Government. 6.3 Any breach of rule 45 shall render a person liable to punishment under rule 139 of the Indian Electricity Rules, 1956. 6.4 Provisions of rule 32 of the Indian Electricity Rules, 1956 should be complied with in respect of consumer's installation. No cut-out, link or switch other than a linked switch arranged to operate the earthed and live conductors simultaneously, shall be inserted in the conductor of the consumer's installation to be connected to the neutral conductor of the licensee's system. 6.5 The consumer's mains shall, in all cases, be brought back to the licensee's point of supply and sufficient cable shall be provided for connecting up with the licensee's apparatus. General Wiring Conditions : Mains : 6.6 Switches and Fuses : The consumer shall provide proper linked quick-make and break main switches of requisite capacity to carry and break current in each conductor near the point of commencement of supply. The switches in the consumer's premises shall be on the live wire and the neutral conductor shall be marked for identification where it leaves the consumer's main switch for connecting upto the meter. No single pole switch or cut-out should remain inserted in any neutral conductor. 6.7 Balancing of load : The consumer taking three-phase supply shall balance his load between the phases as per the IE Rules, 1956 Annexure VI, clause 22 (c). 6.8 Earthing: Gas and water pipes shall on no account be used for earthing purposes. All wiring shall be kept as far as possible away from gas and water pipes. 6.9 Domestic appliances : For the safety of the wiring at the consumer's premises, separate circuit for heaters, geysers, air-conditioners and for cooking apparatus like oven, micro wave oven shall be run with adequate size of wire from the main distribution board of the consumer. Wall plugs on the circuits for domestic appliances shall be of the three-pin type, the third pin being connected to "earth". Two pin plugs shall not be allowed. All appliances used in bathroom for heating or washing purposes or in any damp location must be effectively earthed. 6.10 Plugs : All plugs shall be provided with switches on the live wire and not on the neutral (IE Rules, 1956 Annexure VI, clause 22 (h)). 6.11 Apparatus interfering with licensee's system The licensee may discontinue the supply giving reasons if the consumer installs any instrument, apparatus that are likely to affect adversely, the supply to other consumers. Supply shall be restored on taking appropriate remedial action to the satisfaction of the licensee. A. C. Motor installations : 6.12 The motor shall be provided with control gear so that the starting current of consumer's installation does not in any case exceed the limit given in the following schedule :
Nature of Supply |
Size of Installation |
Limit of starting current |
Single Phase. |
Upto and including 1 BHP |
Six times full load current. |
Three phase. |
Above 1 BHP and upto and including 10 BHP |
Three times full load current. |
|
Above 10 BHP and upto and including 15 BHP |
Twice full load current. |
|
Above 15 BHP |
One and a half times full load current. |
Sr. No. |
Rating of Individual Induction Motor |
KVAR Rating of LT Capacitors |
1. |
3 BHP and above upto 5 BHP |
1 |
2. |
Above 5 BHP upto 7.5 BHP |
2 |
3. |
Above 7.5 BHP upto 10 BHP |
3 |
4. |
Above 10 BHP upto 15 BHP |
4 |
5. |
Above 15 BHP upto 20 BHP |
5 |
6. |
Above 20 BHP upto 30 BHP |
6 |
7. |
Above 30 BHP upto 40 BHP |
7 |
8. |
Above 40 BHP upto 50 BHP |
8 |
9. |
Above 50 BHP upto 100 BHP |
9 |
(a) A linked switch with fuse(s) or a circuit breaker for consumers having aggregate installed transformer/apparatus capacity upto 1000 KVA if supplied at voltage of 11 KV and 2500 KVA if supplied at a voltage of 33 KV.
(b) A circuit breaker along with linked switch for consumers having an aggregate installed transformer/apparatus capacity above 1000 KVA if supplied at 11 KV and above 2500 KVA if supplied at 33 KV.
(c) In either case, suitable automatic circuit breakers shall be installed on the low-tension side of each transformer or on each feeder.
6.20 Extra-High Tension Consumer Extra-High Tension consumer shall install a circuit breaker on HV side of the transformer (refer rule 50 of IE Rules). 6.21 HT/EHT Consumers All transformers, switch-gears and other electrical equipments in the installation of the consumer and also those directly connected to the feeders or lines of the licensee shall be of suitable design and be maintained by the consumer to the satisfaction of the licensee. The setting of fuses and relays on the consumer's control gear, as well as the rupturing capacity of any of his circuit breakers, shall be subject to the approval of the licensee. 6.22 Notwithstanding the provisions under clause 6.19, it is necessary that the consumer should obtain prior approval of the Electrical Inspector about the suitability of protective devices or circuit breakers in accordance with the provisions of the prevailing laws, rules and regulations. 6.23 The consumers shall maintain a power factor of 90% and above. Consumers shall be liable to pay penalty or receive incentive as may be specified by the Commission, from time to time, on account of variation from specified power factor. The licensee may discontinue supply, after due notice of 15 days, to any installation where the average power factor is less than 70% without prejudice to the right of the licensee to levy demand/minimum charges as applicable during the period of disconnection. 6.24 Inspection and Testing of Consumer's Installation Before any wiring or apparatus in the case of low-tension consumer, and any transformer, switchgear or other electrical equipment in the case of high-tension consumer is connected to the system, it shall be subject to inspection and approval of the licensee and no connection shall be made without the licensee's approval. In addition, all high-tension installations will have to be approved by the Electrical Inspector and all electrical installations in mines will have to be approved by the Inspector of Mines. 6.25 Upon receipt of the test report, the licensee will notify to the consumer the time and day when the licensee proposes to inspect and test the installation. The consumer shall ensure that the licensed electrical contractor or his representative, technically qualified, employed by him is present at the time of inspection to furnish to the licensee any information concerning the installation required by him. The licensee shall provide a copy of the inspection report to the consumer and obtain the acknowledgement of the consumer. 6.26 Manufacturer's test certificate in respect of all H.T. apparatus shall be produced, if required. 6.27 The licensee shall not connect the conductors and fittings on the consumer's premises with its works unless it is reasonably satisfied that the connection will not at the time of making connection cause a leakage from the installation or apparatus of a magnitude detrimental to safety. The value of the insulation resistance should be as provided in rule 48 of I.E. Rules, 1956. 6.28 If the consumer's installation is found to be not safe for connection, the licensee shall advise the consumer in writing specifying the defects to be rectified. On receipt of intimation of rectification of defects, the licensee shall retest the installation. 6.29 The licensee shall levy no charge for the first test. Subsequent tests, necessitated due to faults found at the initial test shall be charged for in accordance with the rates approved by the Commission. The licensee will not accept any responsibility with regard to the maintenance or testing of wiring on the consumer's premises. 6.30 Extensions and Alterations : No electrical installation work, including additions, alterations, repairs and adjustments to existing installations, except such replacement of lamps, fans, fuses, switches, low voltage domestic appliances and fittings as in no way alters its capacity or character, shall be carried out upon the premises of or on behalf of any consumer, for the purpose of supply to such consumer except by an electrical contractor licensed in this behalf and under the direct supervision of a person holding a certificate of competency. Extension or alteration of load to all high-tension installations will have to be approved by the Electrical Inspector and similarly for all extensions and alterations of electrical installation in mines will have to be approved by Inspector of Mines. 6.31 If as a result of such proposed extensions and alterations, there is possibility of an increase in connected load or contract demand over the sanctioned connected load or contract demand, the consumer shall take steps to submit requisition for additional supply. Failure to regularize the increase in connected load or contract demand may not only result in billing at the penal rates, as provided for under the rules, but may also result in disconnection of supply after due notice. 6.32 Access to Consumer's Premises for inspection of Consumer's Installation The authorized persons of the licensee are entitled, at any reasonable time and on informing the occupier of their intention, may enter the premises of the consumer to which energy is supplied, for the purpose of inspecting and reading meters on the consumer's premises, for disconnecting supply, for removing the licensee's apparatus, for testing, repairs, replacing, altering and maintenance of its property or for doing all things necessary or incidental to proper continuance and maintenance of supply to the consumer. All such persons visiting consumer's premises must carry photo-identity cards issued by the licensee and shall produce the same to the consumer or the occupier before entering the premises. The consumer should immediately check with the licensee if the credentials of representatives are in question. 6.33 The licensee or his authorized person shall be entitled to enter the premises immediately after informing the consumer, for checking unauthorised use of energy, unauthorized additions and alterations to equipment, theft and misappropriation of energy, diversion of power, by-passing or tampering of the meter, or for general inspection and testing. On detection of unauthorised use of energy, unauthorised additions and alterations to equipment, theft and misappropriation of energy, diversion of power or bypassing or tampering of the meter the licensee may take actions as per the provisions of the Act. 6.34 Inspection, testing or checking of any domestic place or domestic premises however shall not be carried out between sunset and sunrise except in the presence of an adult male member occupying such premises. 6.35 If the consumer does not provide reasonable facility to the licensee to enter the premises for the purposes stated in clause 6.32 and clause 6.33, the licensee may give 24 hours' notice in writing to the consumer, of its intention to discontinue the supply. If the consumer still does not provide access, the licensee shall be entitled to discontinue supply to the consumer. 6.36 If the insulation resistance of the consumer's installation is found to be so low as to prevent safe use of energy, the licensee or his authorized representative after giving 48 hours notice shall, without prejudice to other actions as per law, disconnect the supply of power to the premises till the defects are removed, in accordance with rule 49 of Indian Electricity Rules, 1956. 6.37 Rating of Installations : The connected load [refer clause 2.1 (k)] of domestic category of consumers shall be determined as per the procedure give in Annexure 3. Normally survey of load shall be carried out once in two years. The licensee may also carryout verification of load in selected areas periodically. However, if the licensee has reasons to believe that a particular domestic connection or a group of domestic connections might be involved in unauthorised abstraction of power, the officer in-charge may conduct a survey of the consumer's premises. 6.38 The licensee shall send forms of 'self declaration of connected load' to all consumers once in an year. The consumers may fill-up the form, if his actual current connected load is at a variance from the recorded connected load. The domestic consumers may also declare enhanced connected load of their premises, any time during the year, by completing the form given in Annexure-3 and submitting the same to the licensee alongwith an application for change in connected load. The licensee may arrange to conduct a survey of the premises of the consumer to determine the load of the premises. In case such a survey is not carried out within thirty days from the date of submission and the load applied for is higher than the recorded load of the consumer, the load declared by the consumer shall be deemed lo have been accepted. The licensee shall issue the demand note for additional charges, if any, immediately. 6.39 The connected load of all categories other than domestic category of consumers shall be the aggregate of the manufacturer's rating of all energy consuming devices, in the consumer's premises, which can be used simultaneously. This shall be expressed in KW, KVA or HP. During the process of determination of connected load, if the manufacturer's rating is not available or doubtful the licensee may use suitable apparatus to determine the load of the item. If, both air-conditioner and room heater are found in the same premises, the load of the item with higher rating shall be taken into account. Items stocked for the purpose of sale/repair or as genuine spare shall not be considered for the purpose of determination of connected load. The licensee shall carry out periodic survey of streetlights and record the type of lamps being used alongwith their load. 6.40 All installations other than those of domestic category are subject to rating/re-rating by the licensee at its discretion. If the consumer is not satisfied with the rating determined by the licensee, he may get his apparatus rated by one of the engineering institutes approved by the licensee for determination of load of apparatus. Both the consumer and the licensee may depute their respective representatives to be present during the process of determination of load at the institute. The final report issued by the institute shall be accompanied with the details of test(s) conducted. The rating determined by the said institute shall be final and acceptable to both the consumer and the licensee. 6.41 Where for any reason, it is not possible to determine the maximum demand, power factor or any other electrical quantity in respect of an installation, the licensee shall determine such quantities periodically by rating/re-rating, which shall be binding on the consumer. For arriving at conclusion on re-rating the licensee shall be at liberty to install a meter having facility to record maximum demand, power factor, etc. 6.42 If a consumer applies to the licensee for re-rating his installation due to additions or alternations in the installation, the procedure as stated in clause 7.3 to clause 7.14 shall apply. 6.43 Generator in the Consumer's Installation and Parallel Operating with the Supply System of the Licensee Operations of a generator in the consumer's installation to run in parallel with the licensee's system is permissible only with the written consent of the licensee. 6.44 Where no such consent has been given, the consumer shall arrange the plant, machinery and apparatus of his generating units, including an extension of or addition to the same, to operate in an isolated mode and the generator, in no case, should get connected to the licensee's system. The licensee, on intimating the consumer, can enter the premises and inspect the arrangement to ensure that at no time the generator gets connected to its system. 6.45 Where consent has been given for parallel operation, the consumer shall arrange his installation to be protected from disturbances in the licensee's system. The consumer should also ensure that his supply does not get incorrectly connected to the licensee's system. The licensee shall not be liable for any damage caused to the consumer's plant, machinery and apparatus on account of such parallel operation, or any adverse consequence arising thereof. For parallel operation with the grid, the consumer shall have to follow the provisions of the relevant Grid Code and other regulations and payment of charges as approved by the Commission. The actual operations shall be carried out in coordination with both the State Transmission Utility and the licensee. - 6.46 In case the consumer's supply gets extended to the licensee's system from a generator or inverter or from any other source, without appropriate approval from the licensee, causing damage to the licensee's apparatus or to human life, the consumer shall be liable for the same and shall duly compensate the licensee for all losses caused to the licensee or to the licensee's other consumers. 6.47 Harmonics If the licensee detects and proves to the consumer that the consumer's system is generating harmonics above acceptable limits, the licensee may ask the consumer to install appropriate harmonic filter within a reasonable period of time. The tolerance limits of harmonic injections are as follows : -
EHT-THD |
-3% |
HT |
-4% |
LT |
-6% |
Chapter 7
Contract Demand, Agreement, Security Deposit
Contract Demand LT Consumers without Maximum Demand (MD) based (two part) tariff 7.1 The Contract Demand for LT consumers without MD based (two part) tariff will be the connected load of the premises as per the agreement entered into between the consumer and the licensee. 7.2 LT Consumers with MD based tariff and all HT and EHT consumers The Contract Demand shall be as per the agreement entered into between the consumer and the licensee and having regard to the requirement of the consumer's installation. [7.3 Procedure for Enhancement of Contract Demand/connected Load] Applications for enhancement of load shall be submitted in duplicate to the licensee in the prescribed form (Annexure 1 and 2). 7.4 The licensee shall examine the feasibility of supply of the enhanced load within thirty days and inform the consumer.(a) whether the additional power can be supplied at the existing voltage or at a higher voltage;
(b) addition or alterations, if any, required to be made to the system and the cost to be borne by the consumer;
(c) amount of additional security deposit, cost of additional infrastructure and the supply arranging charges, if any, to be deposited; and
(d) change in the classification of consumer, if required.
7.5 The application for enhancement of the contract demand will not be accepted if the consumer is in arrears of payment of the licensee's dues. However, the application may be accepted if the payment of arrears due from the consumer has been stayed by a court of law, or by the Commission or an authority appointed by the Commission or facility has been granted by the licensee for payment of arrears in instalments. 7.6 If the supply of enhanced load is feasible, the consumer shall:(a) furnish work completion certificate of consumer's installation and test report from a licensed electrical contractor where alteration of installation is involved.
(b) furnish letter of approval for the electrical installation of the consumer from the Electrical Inspector, and other statutory clearance as required under other regulations in force, if required. Similarly, approval from' Inspector of Mines shall be provided for additional load to be provided for electrical installation for mines.
(c) pay additional security deposit, cost of addition or alteration required to be made to the system, if any, and the supply arranging charges, if applicable.
(d) execute a supplementary agreement.
7.7 If no addition or alteration to the system including new/alternate metering arrangement is required, the enhanced load will be released from a date as stated in the new agreement after completion of the requisite formalities. If the system needs any alteration or addition, the procedure as given for a new connection shall be followed. 7.8 In case of Railways traction, the consumer may be provided such additional supply in excess of contract demand as may be agreed between the licensee and the consumer after the latter has given due notice of six weeks in writing of his desire to have the contract demand altered. [7.8A If a consumer who has reduced his connected load/contracted demand due to any reason, desires to restore the load within one year of such reduction, upto the sanctioned load prior to the reduction, he shall be liable to pay only the actual expenditure incurred in restoration of load applied for. If such restoration of load involves a load which is more than the load sanctioned earlier, supply arranging charges shall be payable on the difference between the load applied for and the load sanctioned earlier. Restoration of load after a period of one year shall attract supply arranging charges as fixed by the Commission from time to time. Such restoration shall be subject to the condition that reduction of load/demand shall not be permitted again within the next one year of supplementary agreement.] 7.9 Procedure for Reduction of Contract Demand Generally no application for reduction of contract demand/connected load shall be entertained by the licensee within the-initial period of agreement, which is two years from the date of commencement of contract. However, if the consumer is able to satisfy the licensee of the compelling reasons for reduction in contract demand/connected load, reduction to the extent of 50 percent of the contract demand/connected load shall be permitted once during the period of agreement. In case of domestic light and fan consumers, the agreement can be terminated after giving one month's notice on either side at any time, even within the initial period of agreement. 7.10 Applications for reduction of load, after the expiry of initial period of agreement, shall be filed in duplicate with the licensee in the prescribed form alongwith the following documents:(a) Details of alteration/modification/removal of the electrical installation with work completion certificate and test report from a licensed electrical contractor where alteration of installation is involved.
(b) Any other reason for reduction of contract demand.
(c) Details of generators, if any, installed by the consumer along with copies of the safety clearance certificate issued by the competent authority for installation of the generators.
7.11 On receipt of the application for reduction of load, the licensee shall take the following steps :(a) The licensee shall consider the grounds stated in the application, verify the same and decide the application within a period of 60 days by a reasoned speaking order. If the consumer is not satisfied with the decision of the licensee, an appeal can be made to the Electricity Grievance Redressal Forum set up by the licensee under Section 42 (5) of the Act and then to the Electricity Ombudsman as appointed or designated by the Commission under Section 42 (6) of the Act whose decision shall be final subject to such remedy as may be available under any statute.
(b) If the application is not decided by the licensee within the above-mentioned period of 60 days, the applicant may, by a written notice to the licensee, draw its attention to the matter and if no decision is still communicated to him within the period of further 30 days, the permission of reduction of contract demand shall be deemed to have been granted.
7.12 After expiry of the initial period of agreement, the consumer may apply for reduction of his contract demand upto any extent. The above reduction is subject to permissible minimum contract demand specified in clause 3.4. In case the consumer reduces the contract demand with the utility and sources power from another supplier, he shall be liable to pay additional surcharge as provided in Section 42(4) of the Act. 7.13 In all existing agreements executed prior to this Code coming into effect, if there is any provision regarding restriction on reduction of contract demand, the same shall be deemed to have been modified to the extent of the provisions made in this Code. [7.14 When reduction of contract demand is agreed to, the consumer shall execute a supplementary agreement. The licensee shall recalculate the security deposit and the excess security deposit left with the licensee, if any shall be adjusted in three succeeding bills against the bills security in five succeeding bills against the bill amount. However, after adjustment in three Bills, if there is may balance, the same shall be refunded to the consumer within a period of one month.] 7.15 Agreement An agreement, in the standard form, shall be executed by the applicant on the stamp paper of a prescribed value, for getting a new connection and for change in the agreed parameters like contract demand. In case of any special circumstances, special clauses may be added to the agreement, if agreed to between the licensee and the consumer, provided such clauses do not contravene the provisions of the Act, this Code, and other rules and regulations in force. These special clauses shall form a part of the agreement. A copy of the agreement shall be given to the consumer after execution. The maps submitted, agreed upon and signed by both the consumer and the licensee shall form a part of the agreement. 7.16 The licensee shall modify the structure of the agreement form presently in use and to bring it in conformity with the provisions of this Code. 7.17 If there is a need to modify/amend the agreement signed between the licensee and consumer, it may be done by a supplementary agreement. 7.18 Any amendments for the purpose of change of name, shifting of premises or change in connected load shall be done if both the consumer and the licensee agree to these amendments and the same shall be incorporated in the agreement by execution of a supplementary agreement. 7.19 Termination of Agreement If power supply to a consumer remains disconnected for a period of sixty days for non-payment of charges or dues or non-compliance of any direction issued under this Code, the licensee shall issue a show cause notice, to be replied within seven days, to the consumer for termination of the agreement. In case no effective steps are taken by the consumer for removing the cause of disconnection and for restoration of power supply, the agreement of the licensee with the consumer for power supply shall be terminated on expiry of the period of seven days, provided the initial period of the agreement is over. During the period of temporary disconnection the consumer shall be liable to pay the demand charges or minimum charges. 7.20 Domestic and single-phase non-domestic category of consumers may terminate the agreement after giving one month's notice. All consumers other than domestic and single-phase non-domestic category can terminate the agreement after the expiry of the initial period of two years on giving one month's notice. However, if the agreement is to be terminated for reasons whatsoever, for categories other than domestic and single phase non-domestic, before expiry of the initial period of agreement, the consumer shall be liable to pay charges as per tariff for the balance period of the said two years. The licensee shall arrange for special meter reading, at a mutually acceptable date, to facilitate preparation of the final bill of the consumer. The agreement shall be terminated on the last day of the month and the licensee shall raise the final bill accordingly. 7.21 On termination of the agreement, the licensee shall be entitled to remove the service line and his other equipment from the premises of the consumer for supply of power. After permanent disconnection, if the consumer wishes to revive the connection, his application for the same would be treated as an application for new connection and would be entertained only after all outstanding dues have been cleared. 7.22 Miscellaneous No consumer shall sell electrical energy supplied to him by the licensee to any other person. 7.23 In case of breakdowns in electricity supply system of the licensee, the supply of electricity to the consumer may be curtailed, staggered or cut-off as may be warranted according to the situation. The licensee may also curtail, stagger or cutoff electricity supply to consumers on account of periodical maintenance of electricity supply system, after giving due notice to the consumers. 7.24 The licensee may resort to regulation of supply (planned load-shedding) to the consumers, after due notice, if the Commission orders accordingly as per the provisions of Section 23 of the Act. 7.25 The electrical energy supplied to the consumer shall not be utilized by the consumer in any manner prejudicial to the licensee and all usage must be in accordance with the provisions of the agreement and the Acts as applicable. 7.26 No consumer shall divert the use of energy to any other purpose, other than that mentioned in the agreement or extend the line beyond its premises other than that for which it was sanctioned by the licensee, until and unless prior sanction of the licensee is obtained for such diversion or extension. 7.27 Where the consumer's installation is disconnected from the licensee's supply as per direction of the Government, the Electrical Inspector or other appropriate authority, the supply shall be reconnected on payment of prescribed reconnection fee with the approval of the Government or the Electrical Inspector or other appropriate authority, as necessary. During the period of temporary disconnection the consumer shall be liable to pay the demand/minimum charges. [Security Deposit shall be payable according to the Provisions or Section 47 (1) and (4) of the Act and CSERC (Security Deposit) Regulations, 2005.]. 7.28 Initial Security Deposit The licensee may take a security deposit from the consumers for consumption equivalent to the estimated consumption of specific number of days as indicated in the following table.
Sr. No. |
Nature of Consumer |
No. of Days |
Remarks |
1. |
Agricultural |
90 |
Annual average to be estimated/considered |
2. |
Stone crushers, hot-mix plants |
90 |
Annual average to be estimated/considered |
3. |
Consumers unable to provide proof of legal occupation |
90 |
Annual average to be estimated/considered |
4. |
Other consumers |
45 |
Annual average to be estimated/considered |
Chapter 8
Meters
8.1 Requirement of Meters. - No new connection shall be given without a meter and cut-out or a Miniature Circuit Breaker (MCB) or Circuit Breaker (CB) of appropriate specification from the date of issue of this Code. 8.2 All consumers shall have to accept the installation of an appropriate metering device, load-limiter, tamper proof boxes or other apparatus when the licensee approaches them to install one, and the consumer shall be required to provide appropriate and suitable site for placement of meter and related equipments to the satisfaction of the licensee. 8.3 In case of HT supply, if HT metering cannot be readily provided, LT metering may be provided on the LT side of the consumer's transformer. In such cases, electrical quantities for billing purposes shall be computed by adding three percent to the quantities registered by the LT meter towards transformation loss. This arrangement shall not continue for more than three months and the licensee shall arrange to install a meter on the HT side of the transformer within the said period. 8.4 If supply to an HT or EHT consumer is given on an independent feeder for his exclusive use, the metering arrangement may be installed either at the consumer's premises or, if mutually agreed, at the licensee's sub-station. 8.5 The licensee is authorised to review the status of the meters already installed. If better meters are available because of technology up-gradation, those be introduced subject to suitability of the site where meter is placed in the consumer's premises. The licensee may install remote metering device in the consumer premises as per the technical requirements of the specific device and in such cases the consumers shall provide access to the meter through his telephone line. The licensee may also install maximum demand (MD) meter having MD recording feature and ToD features or such additional features in the consumer's premises. The licensee may also install 'check meter' at a consumer's location or for a group of consumers. In case the difference in consumption recorded by the 'check meter' and the 'billing meter' is found to be more than permissible limits, the licensee shall be free to install the billing meter on electricity pole or pillar boxes after giving due intimation in writing to the consumer. 8.6 Supply and Installation of Meters and Cut-outs/MCBs/CBs The licensee shall supply the meter and metering equipments, cut-out/MCB/CB/ load limiter to consumers at the time of serving new service connection or at any other time as required. The licensee shall keep the meter in proper working condition and the consumer shall pay the monthly rent, if any, for the meter and metering equipments at the rate approved by the Commission. If the licensee fails to keep the meter or metering equipment in proper working condition, the consumer shall not be liable to pay the meter rent for the period the meter remains defective. Any consumer, if he so deserves, can purchase and provide his own meter/metering device of the standard approved by the licensee. In such cause the consumer shall maintain the meter in accurate working condition. Scheduled testing of meter/metering device will be conducted by licensee on payment of approved testing fees. Such consumers shall not be Required to pay the monthly meter rent. 8.7 Meter should ordinarily be fixed outside the premises in such a manner that it is protected from the elements (weather etc.) and can be read from outside without the need of meter reader to get the premises unlocked or opened for this purpose. In special situation, the licensee may permit the meter to be fixed at a place different from the one indicated above and this permission shall be accorded by the officer not below the rank of Assistant Engineer and shall be in writing. The consumer shall run his wiring from such point of supply. The meter box shall normally be mounted at such a height that meter reading counter/display window is at eye level. In case of LT consumers meter and the cut-out/MCB or, in case of HT/EHT consumers, meter, circuit breakers and its associated equipment including cables shall be installed by the licensee at the point(s) of supply within the protected premises of the consumer near to main entry gate. 8.8 All new meters should be installed in a tamper-proof meter box. The licensee shall prepare and implement a phased-plan to install tamper-proof metering boxes for all the meters, which are at present installed without meter boxes. 8.9 In case of semi-permanent (kuchha) houses the licensee shall ensure that the meter is properly fixed on a wall and is accessible to the meter reader. In case the consumer does not provide good quality wall for fixing the meter, the licensee shall be free to fix the meter on the electricity pole or in a pillar-box to be provided by the licensee. The licensee shall also ensure that the earthing of the installation is proper. 8.10 In case meter is installed inside the premises the meter and other equipments of the licensee shall be placed very near to the point of entry of supplier's line, so that the metering unit is visible from outside the premises and independent/unobstructed entry to the meter or metering cubical can be provided. Wherever required the consumer shall provide and maintain at his expense a locked and weatherproof enclosure of a design to be approved by the licensee for the purpose of housing the licensee's terminal high tension switchgear and equipment. 8.11 Whenever new meter/metering equipment is installed (as a replacement or for a new connection), the meter shall be properly sealed on behalf of and in the presence of representatives of both the parties. Both the representatives, witness to the sealing shall affix their signatures on the specified documents mentioning their full name. The seal, name plates and distinguishing numbers or marks affixed on the meter and metering equipment shall not be broken, erased, altered or in any way interfered with by either party except in the presence of a duly authorised representative of the other party. 8.12 (i) The consumer shall be responsible for safe custody of meter(s), cut- outs/MCB/CB etc., except in cases where such meter(s), cut-outs/MCB/CB etc. are installed in the premises of the licensee.(ii) In case a meter is lost or stolen from the premises of the consumer, the consumer shall report such matter in the police station and the supply shall be restored by the licensee after installation of a new meter at the cost of the consumer.
8.13 Testing of Meters It shall be the responsibility of the licensee to satisfy himself regarding the accuracy of the meter before it is installed and may test it for this purpose. 8.14 The licensee shall also conduct periodical inspection/testing of the meters as per the following schedule:
(a) |
Single phase meters |
: |
once every five years |
(b) |
LT 3 phase meters |
: |
once every 3 years |
(c) |
HT meters including MDI |
: |
once a year. |
Chapter 9
Billing
9.1 Meter Reading, Bill Generation and Bill Distribution. - The periodicity of the meter reading for various categories of consumers is given below. The licensee may however, improve upon the schedule if he finds it necessary or useful.
Consumer Category |
Meter Reading |
Domestic - Rural |
Once in three months |
Domestic - Urban (only under Municipal Corporation, Raipur, Bilaspur, Durg and Bhilai) |
Monthly |
Other Domestic Urban |
Once in two months |
Non-Domestic<10KW - Rural |
Once in two months |
Non-Domestic - Others (Urban & Rural) |
Monthly |
LT Industrial |
Monthly |
Agriculture - Rural |
Once in three months |
Agriculture - Urban |
Once in two months |
Street light, Waterworks, X-Ray Plants, Electric Crematorium |
Monthly |
HT |
Monthly (as far as practicable on the same day of the month) |
(a) date on which bill will be issued by the licensee every month to the consumer
(b) date by which bill will be delivered to the consumer, and
(c) due date for payment of his bills.
These will normally be the due dates for all billing cycles for that consumer during that financial year. T he licensee shall arrange to get the name of the bill distributor rubber-stamped and the bill distributor shall write down the delivery date of the bill on the body of the bill before it is handed over to the consumer. 9.12 Separate bills shall be issued for audit recovery and other recoveries except demand for additional security deposit. Such bills should be accompanied by the written details of basis of billing, period of billing etc. 9.13 The licensee shall endeavour to take monthly meter reading instrument (MRI) download for all connections where meters with MRI download facility are installed. 9.14 If for any reason, meter is not accessible for reading, the licensee shall send a notice in writing to the consumer to keep the meter available for reading at the time and date given in the notice. If after the notice, the consumer does not given access to the meter for reading, the licensee shall be free to send a provisional bill together with a surcharge. The rate of surcharge shall be as provided in the Schedule of Miscellaneous Charges. The provisional bill shall be prepared on the basis of average monthly consumption of the previous financial year. 9.15 The amount thus billed shall be adjusted against the bill raised on the basis of actual meter reading during subsequent billing cycle, such provisional billing shall not continue for more than two meter reading cycles at a stretch. If the meter remains inaccessible even for the next cycle, the consumer will be served with a notice to open his premises for reading of the meter at a fixed time and date. If the meter is not accessible at the time fixed in the notice, the supply will be liable to be disconnected after serving a 24 hour notice under section 163 (3) of the Act. 9.16 It is the responsibility of the meter reader to note down the details of every stopped/defective meter and to file a report at the end of each working day in prescribed proforma to the officer in charge of the distribution centre in case of LT consumers and officer in charge of the circle office in case of HT consumers, who shall be responsible to take immediate steps to replace or repair the stopped/defective meter. In addition to the entry made in the meter-reading book, a separate monthly report shall be required to be given by the officer in charge of the distribution centre to the officer in charge of the sub division and division offices, in respect of all stopped meters and the action taken to replace them. 9.17 In order to recover the energy charges for the duration when the meter remains dysfunctional, average monthly consumption of previous three meter reading cycles shall be the basis of billing. In case a check-meter is available, the readings of the meter may also be used for assessment of consumption. In case of HT consumers if during the period when the main meter is defective, the check meter is not installed or is also found defective, the quantity of electricity supplied shall be determined as stated above; provided that if in the opinion of the licensee, the conditions in the consumer's installation during the month in question were such as to render billing on such average consumption not equitable either to the consumer or to the licensee, the electricity supplied during such period shall be determined by the incharge of the local area circle of the licensee. In the event of the consumer not being satisfied with such determination, he may appeal to the incharge of the local Region of the licensee. 9.18 For low tension consumers, the defective meter shall be replaced within a period of thirty days, from the date of reporting of the fault. In case of HT consumers, meter should be replaced within fifteen days of detection of fault. 9.19 The meter reader shall furnish a list of connections where the meter reading could not be recorded or the meter has not recorded any consumption of electricity, to the officer in charge (OIC) of the District Centre. The OIC shall prepare a list of such consumers where meter reading could not be taken or the defective meter could not be replaced (refer clause 8.20) within thirty days and report the same to the Assistant Engineer and Executive Engineer. The licensee shall develop and have in place a detailed document describing systems, procedure and accountability regarding replacement of defective meters. 9.20 Senior officers of the licensee shall carry out the sample checking of meter readings as per the Schedule drawn out by the officer in charge of the distribution circle of the area. It should be the endeavour of the licensee that meter readings in case of atleast 10% of LT meters are checked in a year by the team of officers, not below the rank of Junior Engineer. 9.21 The licensee may send bills to consumers by hand or by post (also see clause 9.11 - regarding the date of delivery of bill). In case of hand delivery of bills proof of service of bill shall be maintained at the concerned office of the licensee. On a written request from a consumer the licensee shall send it by registered post and the expenses of such delivery of bill shall be recoverable from the consumer. 9.22 The licensee shall ensure distribution of bills to consumers not less than seven days before the due date for payment in cash. 9.23 Special Reading of Meters in cases of Change of Occupancy/Vacation of Premises for Domestic Consumers It shall be the responsibility of the owner of the connection to get a special reading done by the licensee at the time of change of occupancy or on the premises falling vacant. 9.24 The owner/user of the connection may request the licensee in writing for special reading atleast 7 days in advance of the said vacancy of the premises by the existing user or change of the occupancy, as the case may be. 9.25 The licensee shall arrange a special reading to be done and deliver the final bill, including all arrears till the date of billing, on the request of consumer. 9.26 The licensee may charge reasonable fee for the above service as per the miscellaneous charges approved by the Commission. 9.27 Contents of the Energy Bill The bill for metered connections shall have the following details :(a) Service Connection Number
(b) Bill number
(c) Period of bill
(d) Name and address of the consumer
(e) Pole Number from which connection is served
(f) Name, address and telephone number of the distribution centre
(g) Date of issue of bill
(h) Tariff category
(i) Tariff, rate of electricity duty and cess applicable
(j) Contracted/Connected load/demand
(k) Single phase or three phase connection
(l) Identification details of the meter
(m) Reading date - past and present
(n) Meter reading - past and present
(o) Units assessed
(p) Credit
(q) Basis of bill.
(r) Meter rental
(s) Current months' charge - Energy Charges, fixed/demand charge, Minimum Charges, Variable Cost Adjustment (VCA) Charges, Electricity Duty, Cess meter rent, welding/capacitor surcharge, security deposit instalment, Rebate allowed, others if any
(t) Arrear of Electricity Charges, Delayed Payment Surcharge arrears.
(u) Bill delivery charges if applicable
(v) Total charges
(w) Delayed payment surcharge
(x) Due dates of payment - for payment through cheque and cash
(y) Authority in whose favour cheque/Bank draft is to be issued. (To be printed on reverse of the bill).
(z) Security deposit held and required.
9.28 The following information would also need to be provided to the consumer as an attachment to the bill or printed/stamped on the bill : -(a) The names(s)/address(es) of collection centres
(b) Working hours for collection of bills.
(c) Designation and address of the authority with whom grievance pertaining to bills, meter, meter reading etc. can be lodged.
(d) Any other message that the Licensee may like to give e.g. requesting the consumer to indicate their phone number, if available, on the portion of the bill retained by the licensee on receipt of payment. This information can be used for better communication with consumers.
9.29 The bill may contain additional information, if any, as desired by the licensee. 9.30 The licensee shall make arrangements to provide guidance and information to any consumer on telephone and for this purpose shall set-up call centre or centres according to the directives given by the Commission in this regard. All urban areas may be brought under this facility in the first phase and rural areas may be included thereafter. Details of payment status, arrear status, authorised load, contract demand etc. may be provided to the consumer if he discloses his connection number and address. The licensee shall also develop and implement, within a reasonable time as directed by the Commission, a bill details display system on internet for division headquarter towns to being with and later to be extended to cover all district headquarter towns. Access to this information display may be controlled through password system.Chapter 10
Payment and Disconnection
10.1 Payment. - Consumers are expected to make payment for the energy used by them every month. 10.2 The licensee shall ensure adequate publicity of the addresses/locations and working hours of the collection centres including those of banks where consumers can make payments. The licensee shall provide a choice of maximum alternative modes of payment to the consumers like payment through cash, local cheque, bank draft, banker's cheque, Electronic Clearing System (ECS), credit/debit card etc. and a consumer shall be allowed to make payment through cheque for amounts above Rs. 100/-. 10.3 During the days when there is rush at the collection window, separate queueing arrangement should be made for senior citizens, women and physically challenged persons and they should be attended on priority. 10.4 The collection centres should have the facility of receiving payment from consumers/representatives of consumers who wish to make payments on behalf of a number of consumers. Separate counters should be provided for this purpose so that the waiting time for other consumers is not increased. 10.5 In order to reduce the workload of the collection counter, all payments of bills above Rupees five thousand should be made through cheque/banker's cheque/ demand draft payable at local branch of the bank concerned. 10.6 The licensee should make arrangements to receive payment though drop boxes where the consumer may drop his cheque (crossed account payee). The licensee should keep the drop boxes at the collection centres and at other locations as notification from time to time to facilitate the payment without the need for standing in the queue. Cheques should be drawn in favour of the CSEB/licensee. The service connection number, bill month, consumer name and address including telephone number if any should be clearly written on the back of the cheque. In case the bank levies any clearance charge, the same amount shall be recoverable from the consumer in the subsequent bill. 10.7 The due date of payment of all consumers shall normally be fifteen days from the date of issue of bill. If due date of payment mentioned in the bill is a public holiday, the succeeding working day shall be treated as the due date. [10.8 In the event of non-realisation of cheque, the licensee shall have the right to increase the security deposit from the consumer. The licensee shall also have the right to levy cheque dishonour charges besides delayed payment surcharge and also take other actions as per law. The licensee may also insist on future payment by demand draft or by cash.] 10.9 In case of non-receipt of bill within the specified date of receipt of bill (as stated in clause 9.11 (b), the consumer may contact the bill issuing office to collect the duplicate bill and arrange payment of the bill. In case the licensee is not in a position to provide duplicate bill, the consumer shall pay on the basis of past average bill amount. The licensee shall investigate the cause of non-receipt of bill and take suitable steps to ensure that the consumer receives his electricity bills promptly thereafter. 10.10 Every consumer shall be issued a receipt in token of payment having been received. 10.11 The consumer may also be allowed to make advance payment of future bills, which shall be adjusted in the succeeding months. However, only the regular bill amount shall be adjusted from the advance payment. Before adjusting any other amount, the consent of the consumer shall be sought. The licensee will also consider suitable rebate in case of advance payment. 10.12 All consumers who default in the payment of the billed amount shall be liable to pay delayed payment surcharge, on the amount outstanding, at rates as approved by the Commission from time to time. While accepting payment after the due date, the surcharge payable, shall be calculated and additional amount payable shall be collected along with the normal billed amount. 10.13 All payments made by the consumer will be adjusted in the following order of priority :(a) Electricity Duty and Cess on the current consumption
(b) Arrears of Electricity Duty plus arrears of Cess, if any
(c) Delayed payment surcharge
(d) Balance of arrears, if any
(e) Current bill amount
10.14 Instalment facilities : The licensee will lay down a policy for grant of instalment facility for the purpose of recover) of dues subject to the approval of the Commission. The said policy shall also designate the officer(s) authorized to grant instalment facility. 10.15 Disputed/Erroneous Bills (a) In the event of any objection to the billed amount, the consumer may lodge a complaint before the designated officer as mentioned in the energy bill. The supply of electricity shall not be cut off if such person deposits, under protest,(i) an amount equal to the sum claimed from him, or
(ii) the electricity charges due from him for each month calculated on the basis of average charge for electricity paid by him during the preceding six months,
whichever is less, pending disposal of any dispute between him and the licensee.(b) A complaint may be lodged with the designated officer in the complaint form available at the licensee's complaint receiving office. In case such form is not available in the office, complaint may be lodged on plain paper along with the following details :
(i) Name and address of the consumer along with telephone number, if any
(ii) Service connection number
(iii) Category of connection
(iv) Complaint in brief
The designated officer shall resolve the dispute within a maximum period of seven days from the date of receipt of written complaint and shall send a report to the officer in charge of the division giving reasons for the discrepancy if any.(c) If on investigation, the licensee finds the bill to be erroneous, a revised corrected bill shall be furnished to the consumer indicating the revised due date not less than seven days of the date of delivery of revised bill. Excess amount paid by the consumer, if any, shall be adjusted in the subsequent bill(s).
(d) In case it is established that the meter reading recorded was incorrect, responsibility may be fixed and the licensee may take suitable action against the erring employee.
(e) In the event it is established that the original bill was correct, the consumer shall be informed accordingly and notified to pay the balance, if any, with surcharge as applicable within 7 days.
(f) In case the consumer is not satisfied with the decision on the dispute, he may take further action as provided in the Guidelines for Redressal of Consumer Grievance.
10.16 In case of death of a consumer, the legal heir shall be liable to pay the dues of such consumer. The legal heir should also lake steps to get the connection changed in his name within a period of three months. 10.17 Disconnection It shall be the responsibility of the licensee to ensure that no default in payment is continued beyond a reasonable period subject to a maximum of three months without action for temporary disconnection. The authorised official of the licensee will ensure that all the cases pertaining to default in payment are monitored regularly and timely action is initiated as per prescribed procedure for temporary or permanent disconnection. 10.18 If a consumer fails in payment of any bill in full, without the approval of the authorised officer, by the due date, the service connection of the consumer will be liable to be disconnected on temporary basis. Before disconnection of a consumer's installation, the licensee would serve a written notice of fifteen clear days. Effort should be made that before disconnecting a domestic connection; an adult member of the family should be informed. If the proof of removal of the cause for disconnection is produced to the satisfaction of the Licensee's employee deputed for the purpose, the supply shall not be disconnected. In this regard, the licensee shall strictly follow provisions of section 56 of the Act. 10.19 No sum due from any consumer shall be recoverable after the period of two years from the date when such sum became first due unless such sum has been shown continuously as recoverable as arrear of charges for electricity supplied and the licensee shall not cut off the supply of the electricity. 10.20 After temporary disconnection, the supply shall be restored only after the consumer pays the outstanding charges/dues/amount of instalment fixed along with disconnection-reconnection charges. 10.21 A consumer shall be required to make a written request to the office of the licensee if the consumer wishes to get his connection temporarily disconnected for a period upto six months. For duration of temporary disconnection the consumer shall be liable to pay in advance all the monthly charges that are fixed in nature like demand charge, minimum charge, meter rent etc. The consumer shall also be liable to pay disconnection/reconnection charges to avail the facility of temporary disconnection. T he period of 'disconnection on request' can be extended on receipt of a request in writing and on necessary charges being deposited in advance.Chapter 11
Prejudicial use of Supply
[11.1 The licensee shall take all necessary measures to prevent theft or unauthorized use of electricity or tempering, distress or damage to electrical plants, electric lines, equipments or meters. 11.2 The consumer shall not make such use of supply given to him by the licensee which is prejudicial to the interest of the licensee. (A) Unauthorised use of electricity: 11.3 Section 126 of the Act deals with assessment of unauthorized use of electricity. The Chhattishgarh State Electricity Rules, 2006 as notified by the State Government on 22-3-06 (Rules, for short) contain elaborate provisions to deal with such cases. The provisions of these Rules are to be followed by all concerned. 11.4 Unauthorized use of electricity shall mean the usage of electricity—(i) by any artificial means; or
(ii) by a means not authorised by the concerned person or authority or licensee; or
(iii) through a tampered meter ; or
(iv) for a purpose other than for which the usage of electricity has been authorized; or
(v) by use of phase-splitting device to facilitate working of three-phase motors/appliances during the period of single phase supply; or
(vi) through increase in connected load by LT consumers in excess of the load as per the agreement. This, however, will not be applicable to domestic consumers; or
(vii) extension of power supply beyond the area of use as authorised in the agreement; or
(viii) shifting of location of meter; or
(ix) unauthorized alterations in electrical installations; or
(x) disconnection of neutral; or
(xi) through a meter or equipment associated with metering, which has been accidentally damaged.
11.5 If on inspection of any place or premises, the licensee comes to the conclusion that any perse i is indulging in unauthorized use of electricity in that place or premises, the licensee may disconnect supply of electricity to such person forthwith. Intimation for such action shall be sent to the person within 24 hours of such disconnection, as per the procedure laid down in the Rules. 11.6 The assessing/authorised officer shall prepare the bill for unathorized use of electricity, presuming that such unauthorised use continued for a period of three months immediately preceding the date of inspection in case of domestic and agricultural connections, and for a period of six months immediately preceding the date of inspection in case of all other categories of connections, unless proof is produced to the contrary by the person accused of unauthorized use. In cases where the period of connection is less than the period as mentioned above, the period for assessment will be from the date of connection till the date of inspection. However, in case an electronic meter is installed in the premises, data shall be analyzed to ascertain the exact period during which unauthorised use of electricity continued and such period shall be taken for assessment purposes. 11.7 Assessment shall be made at a rate equal to one-and-half times (1 */2 times) the tariff applicable for the relevant category. 11.8 The methodology for assessment of consumption by way of unauthorised use of electricity shall be as follows :(a) In respect of LT consumers :
Units assessed per month = L x D x H, where L is load found connected at the time of inspection in KW; D is number of days per month which shall be taken as 30, during which unauthorised use of electricity is suspected; and H is hours per day, which shall be taken as 8 hours for all consumers except industrial consumers in respect of whom the hours of use shall be as per the hours the industry generally operates in a day which in any case shall not be less than 8 hours.(b) In respect of HT consumers :
Assessment shall be based on the data obtained from the electronic meter through MRI and shall be the average consumption for three months prior to the date from which unauthorised use has commenced. In the absence of MRI data the normal consumption pattern of the consumer as that of similar industries may be taken for the purpose of billing. 11.9 The order or provisional assessment shall be served upon the person in occupation or possession or in charge of the place or premises within a period of 3 days from the date of inspection in the manner as prescribed in the Rules by registered post or by hand and the acknowledgment shall be obtained : Provided that if the amount of provisional assessment is accepted and the assessed amount is deposited within seven days of service of provisional bill, such person shall not be subjected to any further liability or any action by any authority whatsoever. 11.10 The licensee shall reconnect the supply on receipt of full amount of provisional assessment. The licensee may also reconnect the supply on receipt of one-third of the provisional assessment amount pending final assessment as per clause 11.12 below. 11.11 Any person, who has been served notice under clause 11.9. may file objections, if any, within 7 days from the date of receipt of the provisional bill, to the assessing officer, as designated by the State Government in the Rules, who may, after affording a reasonable opportunity of hearing to such person, pass final order of assessment of electricity charges within one month of the date of the provisional assessment. 11.12 Any person aggrieved by the final order may prefer an appeal within 30 days of the final order to an appellate authority as designated by the State Government in the Rules, provided that one-third of the assessed amount is deposited with the licensee and documentary evidence of such deposit has been enclosed with the appeal. 11.13 The form of appeal and the manner in which the appeal may be filed shall be as per the CSERC (Procedure for Filing Appeal Before the Appellate Authority) Regulations, 2005 notified on 5-12-05 by the Commission, as amended from time to time. 11.14 The order of the appellate authority shall be final. 11.15 When a person defaults in making payment of assessed amount, he shall be liable to pay, in addition to the assessed amount, on the expiry of thirty days from the date of order of assessment, an amount of interest at the rate of sixteen percent per annum compounded every six months as provided in Section 127 (6) of the Act. (B) Theft of Electricity 11.16 Section 135 of the Act deals with theft of electricity. The State Electricity Rules contain detailed provision to deal with theft cases, which have to be strictly followed by all concerned. 11.17 Whoever, dishonestlya. taps, makes or causes to be made any connection with overhead underground or underwater lines or cables, or service wires or service facilities of a licensee; or
b. tampers a meter, installs or uses a tampered meter, current reversing transformer, loop connection or any other device or method, which interferes with accurate or proper registration, calibration or metering of electric current or otherwise results in a manner whereby electricity is stolen or wasted; or
c. damages or destroys an electric meter, apparatus, equipment, or wire or causes or allows any of them to be so damaged or destroyed as to interfere with proper or accurate metering of electricity, so as to abstract or consume or use electricity, shall be punishable under the provisions of Section 135 of the Act and the Rules.
11.18 Entry, search and seizure for the purpose of detection of theft as per subsection (2) of Section 135 of the Act shall be undertaken by an officer authorised by the State Government in the Rules and such entry, search and seizure shall be carried out as per the procedure laid down therein. 11.19 In case theft of electricity is detected in the premises which do not have regular electricity connection, the licensee shall forthwith disconnect the supply to such premises and shall remove the cause of theft immediately by removing the line/cable/plant or illegal meter up to the distribution main and other apparatus which are found being used for the purposes of theft of electricity as per the provisions of the Act and the procedure laid down in the Rules. The licensee may subsequently remove or divert or convert the line, cable or electrical plant to prevent further theft of electricity provided that such action shall not result in any inconvenience or disruption of supply to other consumers. 11.20 In case where the person has a regular electricity connection from the licensee and where the theft of electr'city is detected by bypassing the meter or metering equipment and the electrical load, fully or partially, or the connection is found connected directly with the lines, cables or electrical plant; or the meter is found tampered with a dishonest intention, the electric supply to such premises shall be disconnected forthwith by the licensee. 11.21 Where it is established that there is a case of theft of energy, the officer authorised in this behalf by the State Government in the Rules shall prepare the bill of theft of electricity as provided in Section 154 (5) of the Act, pending adjudication by the special court, as per the Electricity (Removal of Difficulties) Order dated 8-6-05 [S.O. 790 (E)]. 11.22 The assessment shall be an amount equivalent to two-and-half times the rates as per applicable tariff for the relevant category for a period of twelve months preceding the date of detection of theft of energy or the exact period of theft if determined, whichever is less. A bill shall be served upon on the person under proper receipt. 11.23 The methodology for assessment of consumption due to theft of electricity shall be as follows :(a) In respect of LT consumers :
Units assessed per month = L x D x H, where L is load found connected at the time of inspection in KW;
D is number of days per month which shall be taken as 30, during which unauthorised use of electricity is suspected; and
H is hours per day, which shall be taken as 8 hours for all consumers except industrial consumers in respect of whom the hours of use shall be as per the hours the industry generally operates in a day which in any case shall not be less than 8 hours.
(b) In respect of HT consumers:
Assessment shall be based on the data obtained from the electronic meter through MRI and shall be the average consumption for three months prior to the date from which unauthorised use has commenced. In the absence of MRI data the normal consumption pattern of the consumer as that of similar industries may be taken for the purpose of billing. 11.24 In making such assessment the authorized officer shall also take into account the representation of the person submitted within 48 hours of the detection of theft or any other evidence he considers relevant. The authorized officer shall record reasons for the assessment made. Charges, if any, paid by the person during the period for which the assessment is done, shall be duly credited if necessary, to avoid duplication of billing for such period. 11.25 The authorized officer shall serve an order for charges against the theft of electricity committed by the person within 3 (three) days in the manner as provided in the Rules and the person shaii make payment within 30 days. 11.26 The supply shall be restored to the consumer within 48 hours after removal of the cause of theft, provided that the assessed amount is deposited in full. The licensee shall take all measures to avoid recurrence of theft in the same premises before restoration of supply. 11.27 The above action shall be without prejudice to the filing criminal proceedings by the licensee in the special court constituted under chapter XV of the Act against the person involved in theft of electricity. Compounding of offences 11.28 Compounding of offences shall be as per the provision of Section 152 of the Act. In compounding offences the authorised officer shall act in accordance with the procedure laid down in the Rules. 11.29 A person or consumer in custody, in connection with the offence of theft of electricity, shall be set at liberty on payment of sum of money in accordance with the Sub-Section (1) of Section 152 of the Act or the amount as may be specified by the-State Government from time to time. No proceeding shall be instituted or continued against such consumer or person in any criminal court as per Section 152 (2) of the Act. 11.30 The compounding of an offence under Section 152 of the Act shall be allowed only once for any person or consumer. (C) Prevention measures 11.31 The Electricity (Removal of Difficulties) Order 2005 [S. O. 790 (E) dated 8th June, 2005] notified by Ministry of Power, Govt, of India mandates adoption of measures to control theft. 11.32 In order to reduce and prevent diversion, theft or unauthorized use of electricity or tampering, distress or damage to electrical plant, electric lines or meter, necessary preventive measures shall be taken by the distribution licensee. 11.33 The licensee shall arrange to provide tamper proof meter boxes on meters of at least 20% connections every year so as to ensure that within next 5 years meters installed at all the premises have tamper proof meter boxes. The licensee shall simultaneously review the status of the service lines to ensure that it is proper and wherever required, it should be replaced to prevent theft/bypassing of meter. 11.34 The licensee shall undertake regular inspection of premises of consumers and keep up necessary vigilance to ensure prevention of theft or unauthorized used of electricity or tampering, distress or damage to electrical plant, electric lines or meter. Priority shall be given in inspection/vigilance to theft-prone areas. 11.35 The licensee shall evolve a system and put in place such a system within 6 months, for regular monthly monitoring of consumption of high value consumers, which shall include all the HT connections and LT connections having contract demand/connected load of 25 HP and above. Wide variations in consumption hall be carefully analyzed. The licensee shall arrange prompt inspection in doubtful cases. 11.36 The licensee shall arrange to ensure that 33 KV & 11 KV feeder-wise losses are worked out for identified cities and district headquarter towns of the State in phases and thereafter for other areas. The licensee shall take suitable steps for reduction of losses in the pockets of high loss identified by working out losses in the above manner. 11.37 The licensee shall install meters on all distribution transformers and carry out energy audit so as to identify high loss pockets and take further suitable action for reduction of losses in such pockets. 11.38 The licensee shall endeavour to install remote metering devices on all HT connections on priority for the purpose of monitoring of consumption and prevention of theft of electricity. The licensee shall further endeavour to install remote metering devices on high value LT connection. 11.39 The licensee shall arrange to give due publicity through the media, TV and newspapers to bring awareness about the level of commercial losses, its implications on honest consumers and seek their co-operation in prevention and detection of theft or unauthorized use of electricity or tampering, distress or damage to electrical plant, electric lines or meter. The licensee shall also install display boards containing the information about the above at its consumer service related offices. 11.40 The licensee may, as early as possible, arrange to suitably display in its website region wise, circle wise, devision wise, sub-station wise and feeder wise losses, efforts made for prevention of diversion of electricity, theft or unathorized use of electricity or tampering, distress or damage to electrical plant, electric lines or meter and results obtained. The website may be updated every quarter. 11.41 The licensee shall arrange to provide requisite security force to the authorised officers for their safety. Such security squads shall invariably accompany the authorised officers during raids in order to ensure their safety. 11.42 The licensee may replace overhead bare conductors with cables in theft-prone areas to prevent theft by direct hooking of the licensee’s lines. 11.43 The licensee shall provide HV distribution system (LT less system) in theft-prone areas using small capacity distribution transformer, wherever necessary. 11.44 The licensee is authorized to relocate the meters of existing consumers to an appropriate location so that it is clearly visible and reading can be taken 4 from outside the premises but within the boundary wall and easily accessible for reading, inspection, testing and other related works. In case of doubtful cases where continuous vigil is not possible, the licensee may install check meters on its poles/feeder pillars. In case of repeated theft of electricity the licensee may install billing meters for such connections on iis poles/feeder pillars. 11.45 Expenditure on account of prevention of theft shall be a pass-through in the ARR of the licensee in determination of tariff. 11.46 A list of cases where theft of electricity has been detected shall be maintained by the licensee. The licensee shall also maintain list of cases to clearly identify where second offence and subsequent offence (s) of theft have been detected and take action as per ti e provisions of the Act.]Chapter 12
Miscellaneous
12.1 Force Majeure. - The licensee or the consumer shall not be liable for any claim for loss, damage or compensation whatsoever arising out of failure of supply when such failure of supply is due, either directly or indirectly, to war, mutiny, civil commotion, riot, terrorist attack, flood, fire, strike (subject to certification by Labour Commissioner), lockout (subject to certification by Labour Commissioner), cyclone, tempest, lightning, earthquake or any act of God. 12.2 If at any time during the continuance of the agreement between the licensee and the consumer, the plant or premises of the consumer is destroyed or damaged due to force majeure conditions mentioned in clause 12.1. rendering the plant or premises wholly or substantially unfit for occupation or use. the consumer may. on giving 7 days notice in writing to the licensee, about such a situation, take a reduced supply of power as may be necessary and feasible. In all cases where the consumer claims Force majeure conditions, the licensee's authorised representative shall verify the same. Such a facility shall be available to the consumer only if the period of reduced supply is for a minimum period of 60 days and upto a maximum of six months. The aforesaid period of reduced supply shall not be counted towards the initial period specified in the agreement and the period of agreement shall be extended for a further period equal to the period of reduced supply. 12.3 In case the licensee is unable to supply power to a consumer who is not otherwise a defaulter, disconnected or unconnected, for a period of 10 days (each day shall consist of power cut from 00 hours to 24 hours) or more in a calendar month, the licensee shall levy charges on the consumer in the following manner.(a) Energy charges shall be on the basis of actual meter reading recorded in the energy meter.
(b) Other charges (excluding electricity duty and cess) shall be prorated on the basis of the number of days power was provided to the consumer.
This facility will be provided to consumers with metered connections only. 12.4 Tampering, distress or damage to electrical plant, lines or meter If the electrical plant, lines or meter or any other equipment, of the licensee placed in the consumer premises is found tampered, distressed/damaged, the licensee shall be entitled to recover the expenses incurred for restoration of such plant, line, meter or equipment, without prejudice to his right to take action under appropriate provisions of the Act, including disconnection of supply for non-payment of the cost for replacement/rectification, and action for theft or assessment for unauthorized use, as the case may be. 12.5 Authorisation of Franchisees A licensee may authorise a franchisee to distribute electricity on its behalf in a particular area within the former's area of supply as per the provisions of the Act. 12.6 Other Codes and Regulations Consumers shall ensure that new buildings, structures, additions, modifications and any other construction projects keep the minimum clearances required from existing supply lines of the licensee. These minimum clearances are specified in the Indian Electricity Rules, 1956 [***]. 12.7 Service of Notice Any letter, order or document addressed by the licensee to the consumer shall be deemed to be duly given, if served in writing and delivered by hand at, or sent by post/courier, to the address specified in the consumer's application or in the agreement with the consumer if entered into or as subsequently notified to the licensee. In case there is no person on the premises to whom the notice can with reasonable diligence be delivered, the notice may be served by affixing it on some conspicuous part of the premises. 12.8 The licensee may serve any general notice like message regarding load regulatory measures, applicability of new tariff or change in due date of payment etc. in a widely circulated local newspaper. 12.9 All communications to the licensee shall be addressed to :(a) The Secretary of licensee's Company at the Corporate Office of the licensee or to any other officer authorised or designated in this behalf in case of H.T. consumers.
(b) The licensee's Executive Engineer or person holding an equivalent post of the area or his authorised representative in the case of L.T. consumers.
12.10 Unforeseen Circumstances If any circumstances not envisaged in the provisions of the Electricity Supply Code, should arise, the licensee shall, to the extent reasonably practicable in the circumstances, consult promptly and in good faith all affected parties in an effort to reach an agreement as to what should be done. If an agreement between the licensee and those parties cannot be reached in the time available, the licensee shall determine it in the manner best to its ability. 12.11 Wherever the licensee makes such a determination, it shall do so having regard wherever possible, to the views expressed by the affected parties and, in any event, to what is reasonable in the circumstances. Each party shall comply with all instructions given to it by the licensee following such a determination, provided that the instructions are 'consistent with the prevailing Codes and Regulations. The licensee shall promptly refer all such unforeseen circumstances, and any such determination to the Commission. 12.12 Interpretation : These conditions shall be read and construed as being subject, in all respects, to the provisions of the Electricity Act, 2003, the Indian Electricity Rules, 1956 and as amended from lime to time and the Rules made therein and to the provisions of any other law relating to the supply of electricity for the time being in force; and nothing contained in this Code shall abridge or prejudice the rights of the licensee and the consumer under any Central Act or State Act or Rules made thereunder. 12.13 In case of any dispute regarding the meaning or scope or interpretation of this Code, the interpretation of the Commission shall be final and binding on all concerned. 12.14 With the issue of this Supply Code, the "General conditions for Supply of Electrical Energy and Scale of Miscellaneous and General Charges" issued by erstwhile M.P. Electricity Board/Chhattisgarh State Electricity Board, shall cease to operate from the date of its publication in the Chhattisgarh Rajpatra. 12.15 Power to remove difficulties : If any difficult) arises in giving effect to any of the provisions of this Code. the matter may be referred to the Commission who after consulting the parties affected, where considered necessary, may pass any general or special order, not inconsistent with the provisions of the Act or any other enactment relating to supply of electricity for the time being in force, which appears necessary or expedient, for the purpose of removing the difficulty. 12.16 Jurisdiction of Court : All proceedings arising out of this Code and the agreement made thereunder shall be filed only in the Court under whose jurisdiction the agreement was executed. 12.17 Savings Nothing in this Code shall be deemed to limit or otherwise affect the inherent power of the Commission to make such orders as may be necessary to meet the ends of justice or to prevent abuses of the process of the Commission. 12.18 Nothing in this Code shall bar the Commission from adopting in conformity with the provisions of the Act, a procedure, which is at variance with any of the provisions of this Code, if the Commission, in view of the special circumstances of a matter or class of matters and for reasons to be recorded in writing, deems it necessary or expedient for dealing with such a matter or class of matters. 12.19 Nothing in this Code shall, expressly or implidely, bar the Commission dealing with any matter or exercising any power under the Act for which no Codes have been framed, and the Commission may deal with such matters, powers and functions in a manner it thinks fit.Note. - In case of any difference in the interpretation or understanding of the provisions of the Hindi version of this Supply Code with that of the English version (the original version), the latter will prevail and in case of any dispute in this regard, the decision of the Commission shall be final and binding.
Annexure
The licensee is authorised to modify the structure of the formats provided in this annexure in order to meet any requirement that may arise as a consequence of the provisions of this Code so that the formats are consistent with prevailing Rules, Regulations and the provisions of this Code.Annexure 1
Application form - Low Tension Service Connection
New Connection/Shifting of Premises/Change in Contract Demand/Change of Tariff Category/Change of Name of Consumer
(Please strike-off the purpose that is not applicable)
To,.....................
.....................
Sir,I/We request you to supply electricity to my/our premises. The requisite information is furnished below :
1. Consumer(a) Name of the person/organization : ............................................
(b) Name of father/husband/Director/Partner/Trustee : ............................
(c) Category : General/SC/ST/OBC/Others
(Please strike-off category not applicable and tick the category applicable)
(d) Address of the premises where a new connection is hereby applied for/the existing connection is proposed to be shifted :
Premise No. |
: |
.............................................................................. |
Street |
: |
.............................................................................. |
Area/Colony |
: |
.............................................................................. |
Town |
: |
............................................................................. |
District |
: |
............................................................................. |
PIN |
: |
.............................................................................. |
Telephone No. |
: |
.............................................................................. |
|
: |
.............................................................................. |
Bank A/C No. (optional) |
: |
............................................................................. |
(Categories as provided in the list attached)
5. Purpose of supply : ..............................................................(Sub-categories as provided in the list attached)
6. Type of supply : Permanent/Temporary(Please strike-off type not applicable and tick the type applicable)
If temporary specify period - From : ....................... To :....................
7. Proposed Connected Load(a) For domestic connection : ............................................... Watts
Please fill-up and attach format for determination of connected load.
(b) For other categories please fill up the following (Attach duly signed separate list if required)
Item |
Load per item (Watts) |
No. |
Total load (Watts) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(The above information provided by the consumer will only be treated as indicative. During feasibility study the licensee will determine the point of distribution mains and the route through which the cable/service connection will be drawn)
9. Any electricity dues outstanding in licensee's area of operation in consumer's name: Yes/No. 10. Any electricity dues outstanding for the premises for which connection applied for: Yes/No. 11. Any electricity dues outstanding with the licensee against any firm with which the consumer is associated as an Owner, Partner, Director or Managing Director: Yes/No.(For serials 9, 10 & 11 if the answer is 'Yes' in any case please provide details)
12. I/We hereby declare that(a) The information provided in this application is true to my knowledge.
(b) I/We have read the Chhattisgarh Electricity Supply Code and agree to abide by the conditions mentioned therein.
(c) I/We will deposit electricity dues, every month, as per the applicable electricity tariff and other charges.
(d) I/We will own the responsibility of security and safety of the meter, cut-out and the installation thereafter.
Date : |
Signature of the consumer/Authorised Signatory |
Place : |
Name..................................................................... |
|
Designation (if any).............................................. |
Note. - The following documents shall be attached with the application form
1. Proof of legal occupation of the premises alongwith the copy map of the premises/land, indicating proposed point of supply, duly approved by the local authority. In case of street lights the location of street light poles shall be indicated in the map.
2. Approval/permission of the local authority, if required under any law/statute.
3. In case of partnership firm, partnership deed.
4. In case of a Limited Company, Memorandum and Articles of Association and Certificate of Incorporation.
5. In case of industries, copy of certificate of registration with Industries Department.
6. Proof of permanent residential address the consumer and PAN Number, if any. If there is any change at a later date, the same shall be intimated by the consumer to the Licensee immediately.
7. In case of industries permission of Environment Conservation Department.
(To be given to the applicant)
Application form received from................on...................(date) has been entered in the Register at No.........in the licensee’s office situated at.......Signature of the authorised Official of the licensee
with Name, Seal and Date
Note. - In case of any difference in the interpretation or understanding of the provisions of the Hindi version of these Regulations with those of the English version (the original version), the later will prevail and in case of any dispute in this regard, the decision of the Commission shall be final.
Annexure 2
Application form - High Tension/EHT Service Connection
New Connection/Shifting of Premises/Change in Contract Demand/Change of Tariff Category/Change of Name of Consumer
(Please strike-off the purpose that is not applicable)
To,.......................
.......................
.......................
Sir, I/We request you to supply electricity to my/our premises. The requisite information is furnished below : 1. Consumer(a) Name of the person/organization : .............................................
(b) Name of father/husband/Director/Partner/Trustee : ............................
(c) Full Address of the premises where a new connection is hereby applied for/the existing connection is proposed to be shifted : ................................................................................................................................
Pin : ...............
Telephone No.:
Factory/Premises: ...............
Registered Office: ..............
Residence: ...................
E-mail: .......................................
Bank A/C No. (optional): .............................
2. Voltage at which supply is required (kV):
11 kV |
33 kV |
132 kV |
220 kV |
(Please strike-off category not applicable and tick the category applicable)
3. Type of supply : Permanent/Temporary(Please strike-off type not applicable and tick the type applicable)
If temporary , specify period - From :............................ To..............:.............
4. Steps taken by the consumer so far to set-up the installation(a).............................................................................
(b).............................................................................
(c).............................................................................
(d).............................................................................
5. Basis of projection of Contract Demand required(a) Diversity factor assumed: ..................................................
(b) Total Connected Load: ......................................................
6. Phasing of contract demand (CD):
Sl. No. |
CD required (kVA) |
Tentative Date from which required |
Remarks |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(Please strike-off category not applicable and tick the category applicable)
11. Status of land acquisition : ............................................. 12. Expected date by which finance would be available : .................................. 13. Whether the requisite consent/NOC (where applicable according to the list of Pollution Control Board) has been obtained from C.G. Environment Conservation Board, Raipur as per statutory requirements (If yes, a copy should be furnished) : ........................................... 14. Any electricity dues outstanding in licensee's area of operation in the consumer's name : Yes/No. 15. Any electricity dues outstanding for the premises for which connection applied for: Yes/No. 16. Any electricity dues outstanding with the licensee against any firm with which the consumer is associated with any firm as an Owner, Partner, Director or Managing Director: Yes/No(for serial 15, 16 & 17 if answer is 'Yes' in any case please provide details)
17. I/We hereby declare that :(a) The information provided in the form above is true to my knowledge.
(b) I/We have read the Chhattisgarh Electricity Supply Code and agree to abide by the conditions mentioned therein.
(c) I/We will deposit electricity dues, every month, as per the applicable electricity tariff and other charges.
(d) I/We will own the responsibility of security and safety of the meter, cut-out and the installation thereafter.
Signature of the consumer/authorised signatory Date :................ Place:................Note. - The following documents shall be attached with the application form
1. Proof of ownership of the premises.
2. A map indicating therein the proposed location of the plant/office and the point where supply is required. The map should normally be of the scale of 1cm representing 1200cm.
3. Licence/NOC from statutory authority, if required or a declaration by the applicant that his connection does not fall under the requirement of NOC under any statute.
4. In case of a proprietary firm, an affidavit to be submitted slating that the applicant is the sole proprietor of the firm.
5. In case of partnership firm, partnership deed.
6. In case of Limited Company, Memorandum and Articles of Association and Certificate of Incorporation.
7. Proof of permanent residential address of the consumer and PAN Number, if any. If there is any change at a later date, the same shall be intimated by the consumer to the Licensee immediately.
8. Letter of intent for production/enhancement in production may be furnished.
9. List of equipments proposed to be installed along with the expected load.
10. Resolution for authorised signatory.
11. Registration from Industries Department.
12. Extract of project report relevant to power and process requirements (in case of industries).
13. Copy of the relevant section of the current tariff order that provides details of the tariff category opted by the consumer and duly signed by him. This will be appended with the agreement after completion of formalities.
(To be given to the applicant)
Application form received from................on...................(date) has been entered in the Register at No.........in the licensee’s office situated at.......Signature of the authorised Official of the licensee
with Name, Seal and Date
Note. - In case of any difference in the interpretation or understanding of the provisions of the Hindi version of these Regulations with those of the English version (the original version), the later will prevail and in case of any dispute in this regard, the decision of the Commission shall be final.
Annexure 3
Determination of Connected Load
Domestic Connection
1. Name of the consumer : ........................................................ 2. Address : ...................................................................... 3. Consumer Number (for existing connections) : ....................................................... 4. Electrical equipments proposed to be put to use :(Please fill-up the following table to enable determination of the connected load. Normally the actual load of each item will he considered to determine the connected load at the premises. In case of non-availability of the rated capacity of any item, the load shown he low shall he considered.)
Item |
Load per item (Watts) |
No. |
Total load (Watts) |
1 |
2 |
3 |
4 = 2 x 3 |
Bulb |
60 |
|
|
Tube light |
50 |
|
|
Fan |
60 |
|
|
Tape-recorder/Music system |
100 |
|
|
Television |
90 |
|
|
Mixer/Grinder |
375 |
|
|
Electronic iron |
750 |
|
|
Fridge |
150 |
|
|
Cooler |
250 |
|
|
Heater (for cooking and water heating) |
1000 |
|
|
Washing machine |
750 |
|
|
Geyser |
2000 |
|
|
Microwave oven |
2000 |
|
|
Air Conditioner (1 ton) |
1500 |
|
|
Air Conditioner (1.5 Ton) |
2250 |
|
|
Computer |
100 |
|
|
Printer |
150 |
|
|
Pump-set |
375 |
|
|
|
|
|
|
|
Total |
|
(a) Spare socket points/holders shall not be counted towards connected load.
(b) In some domestic connections Geyser, Room Heater and Air-conditioner (without heater) are installed. If both Geyser(s) and Room Heater(s) are present, the load of these two types of items shall be added and compared with the load of air-conditioner(s). The higher load between the two (that is load of Geyser(s) plus Room Heater(s) vis-a-vis load of Air-conditioner(s)) shall be considered for determination of connected load.
Signature of the Consumer |
Signature of the licensee's representative |
Date :.......................... |
Date :........................................................ |
Place :........................... |
Place :...................................................... |
Annexure 4
Test Report
To be filled up by licensed Electrical Contractor
Book No.____________ |
Form No._______________ |
To be filled up by the licensee
This is being issued for providing electrical connection at the premises of Mr./Mrs./ Ms._______________________________. The address of the premises is _________________________ The name and address of the licensed electrical contractor is ____________________________ The date of issue of this report is___________________________To be filled up by the licensed electrical contractor
5. I hereby declare that -(a) I have _________________________class license valid till_____________________________ The license number is________________________
(b) I have completed this work for Mr./Mrs./Ms. ___________________________________ for his _________________________________________
Details of Job
Sl. No. |
Item |
220/230 Volts |
440/400 Volts |
||||||
Red Phase |
Green Phase |
Blue Phase |
No. |
Total Watts
|
|||||
No. |
Total Watts |
No. |
Total Watts |
No. |
Total Watts |
||||
1 |
|
|
|
|
|
|
|
|
|
2 |
|
|
|
|
|
|
|
|
|
3 |
|
|
|
|
|
|
|
|
|
4 |
|
|
|
|
|
|
|
|
|
5 |
|
|
|
|
|
|
|
|
|
6 |
|
|
|
|
|
|
|
|
|
7 |
|
|
|
|
|
|
|
|
|
(c)
(i) The particulars of the employees who executed the job are tabulated below.
Sl. No. |
Name of the Wireman/Trainee |
Designation |
Period |
|
|
|
|
From |
To |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(ii) The work was carried out under the supervision of____________________________ (Supervisor Wireman) whose certificate number is________________________. He is responsible for work carried out during the period_______________________.
(d) This installation specifications adhere to all the provisions of Indian Electricity Rules, 1956.
6. I also declare/certify the following :
(a) |
The installed switches are of correct ratings : |
Yes/No |
(b) |
All the switches and wiring are permanent and of correct specifications |
Yes/No |
(c) |
All plugs are of three pin type and controlled by separate switches |
Yes/No |
(d) |
All the Single Pole switches connected to the phase |
Yes/No |
(e) |
Required permanent mark is provided on the main switch board for Neutral point |
Yes/No |
(f) |
Arrangement for earthing is according to Rule 61 of Indian Electricity Rules, 1956 |
Yes/No |
(g) |
In case of three phase installation |
Yes/No |
|
(i) Danger board, fire extinguisher with buckets, shock chart and first aid kit have been provided for |
Yes/No |
|
(ii) The installation specifications of the switch board is as per Rule 15 of Indian Electricity Rules, 1956 |
Yes/No |
|
Date of testing__________________ |
|
Insulation of Earth |
Insulation between conductors |
Phase 1 |
|
|
Phase 2 |
|
|
Phase 3 |
|
|
Earth Resistance |
Date of testing |
|
|
Electrode No. 1 |
Electrode No. 2 |
|
|
Signature of the Licensed Electrical Contractor
Certificate from Supervisor wireman
It is hereby certified that the aforesaid work has been undertaken by .............................. who has a wireman permit number of...................that is valid till...... It is also certified that testing of the installation has been undertaken by ..................who has a permit number of.............that is valid till...
Signature of the wireman |
Signature of Supervisor, wireman |
Receipt
The test report form number........................ for the installation at the premises of .................prepared by...............has been received on.......Signature of Officer in Charge
Name
Designation
Date